202261962 W 29th Ave & Speer Blvd Sanitary Improvements

Closed September 01, 2022, 11:30 AM

  • Reference numberContract 202261962
  • StatusOpen
  • SummaryThe 29th & Speer Sanitary project will remove and replace existing storm sewer in Speer Blvd from W 29th Ave to Bryant St. Restoration shall include landscaping, concrete flatwork and asphalt paving. Non-ADA compliant accessible curb ramps will also be replaced with compliant ramps.

General Statement of Work

The 29th & Speer Sanitary project will remove and replace existing storm sewer in Speer Blvd from W 29th Ave to Bryant St. Restoration shall include landscaping, concrete flatwork and asphalt paving. Non-ADA compliant accessible curb ramps will also be replaced with compliant ramps. The Louisiana Ave & S Pearl St Intersection Improvements will regrade the existing ROW section to regain the street’s stormwater capacity and direct runoff to current standard and sized storm inlets. Existing inlets and portions of the existing storm drain in system in Louisiana Ave will be removed. Sidewalks and ADA accessible curb ramps will also be reconstructed to current standards.

Statement of Quantities(PDF, 170KB)

Estimated Construction Cost: Between $3,800,000.00 and $4,200,000.00.

Virtual Pre-Bid Meeting on August 2, 2022 at 2:00 p.m.

To access the meeting, please call 720-388-6219 and enter conference ID: ­­­­925-299-745#. Click here to join the meeting.

Pre-Bid Meeting Agenda(PDF, 296KB)

Sign-in Sheet(PDF, 149KB)

Questions Deadline: August 10, 2022 at 3:00 p.m. local time.

Bid Opening on September 1, 2022 at 11:30 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call 720-388-6219 and enter conference ID: ­­­162-050-336#. Click here to join the meeting. To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available July 20, 2022

Digital Download

QuestCDN Project: #8258704

Plan Cost: $15.00

MWBE Goal: 12%

Prequalification: 1E(4) Piped Sewer at or above the $6,000,000.00 monetary level

Contract Administrator: Katie Ragland, DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:                 July 20, 21, 22, 2022

Published In:                         The Daily Journal