Following bid openings, the bids will be summarized and posted, generally within two (2) business days of the advertised opening. Bid tabulations are posted once the City has received a signed contract from the apparent low bidder. Bid tabulations are not posted if it was a lump sum bid. For those, refer to the Bid Summary.
Summary of amounts of bidders base and alternate proposals; lump sum bids and mark-up projects noted with *
Archive Bid Summaries 2021-2016
Line item analysis of each bidder's proposal. Lump sum bids are posted under Bid Summaries.
Project |
Amount |
Awarded Firm(s) |
202367723 - 2023 Emergency Wastewater Repairs(PDF, 138KB) |
$4,191,995.00 |
SEMA Construction, Inc. |
202366920 - 2023 Citywide Chip Seal and Crack Seal(PDF, 89KB) |
$4,949,320.00 |
Vance Brothers, Inc. |
202366828 - 2023 Directional Boring Master On-Call(PDF, 220KB) |
$2,758,964.50 |
Colorado Boring Company |
202366352 - 2023 Hot-in-Place Recycling and Repaving(PDF, 114KB) |
$5,042,399.50 |
Cutler Repaving, Inc. |
202366351 - 2023 Street Maintenance Contract Mill and Overlay(PDF, 96KB) |
$2,607,987.50 |
Brannan Sand and Gravel Company, LLC |
202366350 - 2023 Concrete Panel Replacement(PDF, 115KB) |
$1,577,975.00 |
Keene Concrete, Inc. |
202366349 - 2023 Citywide Concrete Spot Repair(PDF, 111KB) |
$922,500.00 |
Silva Construction, Inc. |
202366348 - 2023 Citywide ADA Ramp and Concrete Repair, Phase 3(PDF, 111KB) |
$2,917,606.00 |
Silva Construction, Inc. |
202366347 - 2023 Citywide ADA Ramp and Concrete Repair, Phase 2(PDF, 103KB) |
$3,087,250.00 |
Keene Concrete, Inc. |
202263872 - Speed Limit Sign Replacement(PDF, 113KB) |
$1,694,825.00 |
RoadSafe Traffic Systems, Inc. |
202264840 - 2022 Elevate Denver Bond Paving #8(PDF, 116KB) |
$7,563,680.77 |
Asphalt Specialties Company, Inc. |
202264989 - Mobility Choice Network 38th St and Blake St Mobility Hub(PDF, 113KB) |
$247,276.00 |
TechCon Infrastructure, LLC |
202264119 - RTO Device and Reliability Project(PDF, 119KB) |
$2,850,240.00 |
Colorado Boring Company |
202264383 - Speer Boulevard Viaduct Bridge Preventative Maintenance(PDF, 95KB) |
$17,322,926.90 |
SEMA Construction, Inc. |
202264125 - SRTS - McAuliffe International School(PDF, 149KB) |
$2,262,770.12 |
Kraemer North America, LLC |
2022xxxxx - 2022 Wastewater Infrastructure Program Support(PDF, 176KB) |
$2,000,000.00 |
SEMA Construction, Inc. |
202263040 - Mill Levy 16A, 17A, and 38 - Traffic Signals Construction(PDF, 151KB) |
$3,580,868.00 |
Sturgeon Electric Company, Inc. |
202261962 - W 29th Ave & Speer Blvd Sanitary Improvements(PDF, 143KB) |
$4,880,900.95 |
Concrete Works of Colorado, Inc. |
202264319 - Citywide ADA Ramp and Concrete Repair Phase 4(PDF, 121KB) |
$2,777,483.00 |
Silva Construction, Inc. |
202264320 - 2022 Citywide ADA Ramp and Concrete Repair Phase 3(PDF, 122KB) |
$2,708,933.00 |
Silva Construction, Inc. |
202263705 - Marston Lake North Upstream of Glenbrook Pond, Phase 1(PDF, 164KB) |
$3,607,252.95 |
Concrete Works of Colorado, Inc. |
202263315 - Connecting Auraria(PDF, 553KB) |
$6,345,997.02 |
Hamon Infrastructure, Inc. |
202262275 - Cole Arts and Science Academy Safe Routes to School(PDF, 66KB) |
$840,992.00 |
TechCon Infrastructure, LLC |
202262166 - South Broadway Multimodal Improvements(PDF, 102KB) |
$14,260,000.00 |
Hamon Infrastructure, Inc. |
202262453 - Tennessee & Oneida Storm System, Phase 1(PDF, 167KB) |
$7,565,456.00 |
BT Construction, Inc. |
202262168 - 2022 Preventative and Critical Lining, Phase 2(PDF, 114KB) |
$1,798,691.00 |
Insituform Technologies, LLC |
202261839 - 2022 Preventative and Critical Lining, Phase 1(PDF, 273KB) |
$4,996,553.00 |
Insituform Technologies, LLC |
202261845 - 2022 Hot-in-Place Recycling and Repaving(PDF, 69KB) |
$4,297,786.50 |
Cutler Repaving, Inc. |
Archive Bid Tabulations 2022-2016