Upcoming Projects

Professional Services (Projected) 

Q4 2021

N/A

 

Construction Services (Projected)

Q4 2021

Tennessee & Oneida Storm Phase 1

  • The project will construct Phase 1 of the Tennessee and Oneida project.  Goal: TBD

Safe Routes To School

  • Provide Curb Extensions, curb ramps and crosswalk markings along Bruce Randolph Ave at Franklin St and Humboldt St to improve Safe Routes to School.  Goal: TBD

WQ - Kentucky & Irving Intersection Improvements

  • This is a new park and green infrastructure construction project.

General Sanitary - 29th and Speer Blvd

  • This project is an open-cut sanitary improvement project in the vicinity of 29th Ave and Speer Boulevard.

WQ SSC - Federal Blvd, Alameda to Mississippi

  • This project will implement Ultra-Urban street side stormwater planters to provide water quality management for up to 18.5 acres of impervious right-of-way.

Mill Levy 16A: Capitol Hill - 13th Ave and 14th Ave 

  • The overall objective of this project is the redesign and reconstruction of the traffic signals and intersections of two major corridors within the City and County of Denver –  13th Avenue, and 14th Avenue. There are a total of six (6) traffic signals is this project and the locations of these traffic signals upgrade are at the following intersections
  • 6 Signals: 13th at: Clarkson, Corona, Downing, 14th at: Clarkson, Washington, Pearl.  Goal: TBD

Mill Levy 17A  

  • Design of new traffic signal at the intersection of 20th and Downing.  Goal: TBD

General Storm - Bowles Ditch Separation

  • This general storm project is to address flooding issues in southwest Denver.  Goal: TBD

HSIP 2018 Pkg 2: Fed @ 38th/Exposition/Kentucky/Mississippi/Jewell/; CO/MLK 

  • Federal and CDOT HSIP program funded intersection improvements at Colorado Blvd & MLK Blvd and 5 locations on Federal Blvd: 38th Ave, Exposition Ave, Kentucky Ave, Mississippi Ave, & Jewell Ave  Improvements may include but are not limited to the construction of rebuilt traffic signals, ADA accessible curb ramps, sidewalks, curb and gutter, and any necessary drainage work.  Goal: TBD

Connecting Auraria

  • Streetscape and bridge design and replacement on Larimer across Speer.  Goal: TBD

Q1 2022

Art/Coll Repaving - N Dunkirk St (N Dunkirk Way to E 56th Ave)

  • This project will perform arterial/collector repaving as deferred maintenance. The improvements include: asphalt mill and overlay; concrete repairs/replacement (curb/gutter, curb ramps, and other miscellaneous features); restriping, and replace/maintain any associated existing bike/ped safety features. All improvements will be constructed to current CCD and ADA standards and specifications.  Limits for this project are: North Dunkirk Street, between North Dunkirk Way and East 56th Avenue.

Art/Coll Repaving - N Speer Blvd (N Broadway to W 11th Ave) 

  • This project will perform arterial/collector repaving as deferred maintenance. The improvements include: asphalt mill and overlay; concrete repairs/replacement (curb/gutter, curb ramps, and other miscellaneous features); restriping, and replace/maintain any associated existing bike/ped safety features. All improvements will be constructed to current CCD and ADA standards and specifications.  Limits for this project are: North Speer Avenue, between North Broadway and West 11th Avenue.

Art/Coll Repaving - S Emerson St (E Ellsworth Ave to E Louisiana Ave)

  • This project will perform arterial/collector repaving as deferred maintenance. The improvements include: asphalt mill and overlay; concrete repairs/replacement (curb/gutter, curb ramps, and other miscellaneous features); restriping, and replace/maintain any associated existing bike/ped safety features. All improvements will be constructed to current CCD and ADA standards and specifications.  Limits for this project are: South Emerson Street, between East Ellsworth Avenue and East Louisiana Avenue.

2019 New Traffic Signals - 1: 11th Ave & Josephine, Alameda & Newport, 13th Ave & Osage

  • This package consists of design for three new signals E 11th Avenue/Josephine Street (Pedestrian Hybrid Beacon), E Alameda Avenue/S Newport Way (Full Traffic Signal), and W 13th Avenue/Osage Street (Full Traffic Signal) that are being combined into one design package for design by one Consultant. This task order will take the signals to final design including a full Plans, Specifications, and Estimate package.  .  Goal: TBD

Mill 10 Monaco Signal Rebuild (Design Only) (09.210)

  • Redesign and reconstruction of seven (7) traffic signals within the City and County of Denver (CCD). The intersections are: N Monaco Pkwy & 14th Ave; N Monaco Pkwy & 13th Ave; N Monaco Pkwy & 8th Ave; N Monaco Pkwy & 6th Ave; N Monaco Pkwy & 4th Ave; N Monaco Pkwy & Cedar Ave; N Monaco Pkwy & Virginia Ave Improvements made to curb ramps, sidewalk, curb and gutters, and curb returns at each intersection for enhanced pedestrian access.  Goal: TBD

20th Street Viaduct Rehabilitation Bridge Project 

  • Rehabilitation of the 20th Avenue Viaduct.  Work includes expansion joint replacement, girder painting, asphalt overlay/membrane, and deck repairs.

Mill Levy 15 Central Capitol Hill at 6th Ave and 8th Ave 

  • This project consists of Consultant Selection and Design to final construction plans for 19-intersections traffic signal replacements in the Capital Hill Neighborhood along 6th Ave and 8th Ave corridors.  Goal: TBD

Mill Levy 26

  • This is the 2020 Traffic Signal Upgrade Mill Levy 26 Project.  The overall objective of this project is the redesign and reconstruction of six (6) traffic signals within the City and County of Denver (CCD).  Goal: TBD

General Storm - Antero Peak

  • This is General Storm project to address local drainage issues.  Goal: TBD

Q2 2022

Jackson St Storm Phase 2

  • The Jackson St. Storm Phase 2 project is a large storm system that extends from 14th Ave and Jackson Street to near Hale Parkway along Colorado Blvd or Albion St.  Goal: TBD

E. 16th Avenue System Phase 2 

  • The E 16th Avenue Street System Phase 2 is a large storm system in Batavia Pl from 17th Ave to approximately Dahlia St.  Goal: TBD

Q3 2022

HSIP CCD 2018 Pkg 4: Park & I-25/I-70; Miss @ Platte/Santa Fe; Colfax/Downing

  • HSIP CCD 2018 Pkg. 4 is a federal grant traffic signal upgrade and intersection improvement project operating under the Highway Safety Improvement Program (HSIP). The project goal is to reconstruct four (4) existing traffic signals within the City and County of Denver located at (1) Park Avenue West at I-25/I-70 On-Ramp; (2) Mississippi Avenue at Platte River Drive; (3) Mississippi Avenue at Santa Fe Drive; and (4) Colfax Avenue at Downing Street.  Goal: TBD

HSIP CCD 2018 Pkg 5: Colfax at Broadway/Lincoln/Grant

  • HSIP CCD 2018 Pkg. 5 is a federal grant traffic signal upgrade and intersection improvement project operating under the Highway Safety Improvement Program (HSIP). The project goal is to reconstruct three (3) existing traffic signals within the City and County of Denver located at (1) Colfax Avenue and Broadway; (2) Colfax Avenue and Lincoln Street; and (3) Colfax Avenue and Grant Street.  Goal: TBD

Citywide Sidewalk - CD2 - Group 1 (9 Seg)

  • This project will design and construct 9 missing sidewalk segments covering approximately 3,280 linear feet across council district 2. These projects are expected to have varying conflicts that will need to be addressed during design. The improvements include missing sidewalk segment design, constructing a Denver Moves: Trails and Pedestrian compliant sidewalk in each identified location and any associated necessary concrete repairs/replacement (curb/gutter, curb ramps, and other miscellaneous features).  Goal: TBD

Q4 2022

Police District 6 Replacement

  • Demo/Rebuild due to significant increase in number of officers and staff for District 6 (40% increase since 2009) Goal: TBD

Morrison Road Improvements

  • Roadway reconstruction between Nevada and Perry, two pedestrian plazas, plus bulb-outs at 3 intersections.  Goal: TBD