Upcoming Projects

Formal Procurements

Professional Services (Projected)

Q3 2023

  • North Central CTN
    Bikeway and multimodal network design

Q1 2024

  • South Platte River Trail - Mississippi to City Limits
    Trail reconstruction design

Construction Services (Projected) 

Q2 2023

  • WQ SS - Federal Blvd, Alameda to Mississippi
    This project will construct Ultra-Urban Streetside Stormwater planters to provide water quality along Federal Blvd.
  • HSIP 2018 Pkg 2: Federal @ 38th/Exposition/Kentucky/Mississippi/Jewell/;CO/MLK
    Rebuild traffic signals and intersection improvements at 38th/Exposition/Kentucky/Mississippi/Jewell/;CO/MLK.
  • Iowa Underpass Mobility Enhancement
    Reconstruct pedestrian pathway along W. Iowa Ave. between S. Acoma St. & S. Santa Fe Drive by removing existing stairway & constructing new ADA-accessible pathway and associated retaining walls.
  • Mill Levy 10 Monaco Signal Rebuild (Design Only)
  • Mill Levy 15 Central Capitol Hill at 6th Ave and 8th Ave
    Traffic signal upgrade to improve traffic safety.

Q3 2023

  • Skyline Park Improvements
    This project will improve existing facilities and provide new amenities as recommended in the Outdoor Downtown Master Plan as well as from the various pop up projects in blocks 2 and 3.
  • General Storm - Longs Peak
    A neighborhood storm system and sidewalk construction project
  • Peoria Street Multimodal Improvements
    The intent of the project is to provide substantial and continuous bicycle and pedestrian infrastructure.
  • Bridge - 8th Avenue Viaduct
    Structural rehabilitation of the 2,370 foot-long 8th Avenue Viaduct between Vallejo Street and Mariposa Street.
  • Washington St. from S. Platte River to E. 52nd Ave
    Washington St. from S. Platte River to 52nd, and two bridges.

Q4 2023

  • Civic Center - Greek Theater Improvements
    The Civic Center Greek Theater Project will design, rehabilitate and construct a premier outdoor performance venue at the Greek Theater. These improvements to Civic Center Park will enhance park visitor’s experience, facilitate greater and more diverse community celebrations and cultural events and will ultimately lead to greater economic vitality for Downtown Denver and the City as a whole.
  • Safer Main Streets - Mississippi Ave Vision Zero Safety Project
    The project will remove one through lane in each direction, construct raised medians to restrict turns from side-streets while still allowing left turn from Mississippi Ave to select side streets.
  • Buchtel Multimodal Improvements (includes Colorado Station Bike/Ped)
    Conversion of Buchtel Boulevard from University to Colorado to be a more complete street. Improve bicycle and pedestrian connections to the Colorado Station bicycle and pedestrian bridge.
  • Evans Avenue Vision Zero Safety Project
  • Federal Boulevard Transit Speed and Reliability Project
    Speed and reliability improvements

Q1 2024

  • General Storm - Torreys Peak
    Relieve localized flooding and icing at three general storm locations.
  • 2019 - Castro Revitalization Project
    Renovation of DHS- Castro building located at 1200 Federal Boulevard. The facility is ~300,000 SF on (4) floors including a partial basement.
  • Boettcher Concert Hall Refresh
    System upgrades and interior renovation at the Boettcher Concert Hall.
  • Heron Pond Carpio-Sanguinette Phase 2 Park
    Water quality, stormwater and park improvements at Carpio-Sanguinette Park.
  • Alameda Ave Underpass Replacement - Bike/Ped/ADA (Santa Fe to Broadway)
    The grade separation will alleviate traffic delays, improve safety, and will improve walkability, bikeability, disabled access and mobility, and livability for the Baker neighborhood and the new TOD development near the Alameda Station.
  • Bridge - Quebec Street over Airlawn Road
    Quebec Street over Airlawn Road.

Q2 2024

  • Denver Fire Station 40
    Improve fire service coverage and response times in Northeast Denver.
  • Bowles Ditch Separation, Phase 2
    This project is a general storm project to address drainage issues in southwest Denver.
  • HSIP CCD 2018 Pkg 5: Colfax at Broadway/Lincoln/Grant
    Reconstruction of existing traffic signals.

Q3 2024

  • Sanitary Lift Station #5
    Rebuild of sanitary lift station #5 in north Denver.

 

On-Call Contracts

These opportunities are open only to those firms currently holding an on-call contract with DOTI.

Professional Services (Projected)

Q2 2023

  • HSIP Alameda
    Roadway safety improvement design
  • 5280 Acoma
    Roadway reconstruction - planning and design
  • Sidewalks 2023 (PB, Bond, CIP)
    Sidewalk Improvement Design

Q3 2023

  • 2024 Bike Paving
    New Bike Lane Design
  • 2023 New Traffic Signal Design
    New Traffic Signal Design
  • Citywide Sidewalk - District 2 - Group 2
    Sidewalk Improvement Design
  • Citywide Sidewalk - District 3 - Group 2
    Sidewalk Improvement Design
  • Citywide Sidewalk - District 7 - Group 2
    Sidewalk Improvement Design
  • Sheridan Blvd Ped Safety from I-70 to 52nd
    Sidewalk Improvement Design

Q1 2024

  • Park Improvements - Ciancio Walks
    Ciancio Walks
  • Park Improvements - Elyria BB Court
    Elyria BB
  • Park Improvements - Washington Picnic Sites 1&2 and Walks
    Washington Picnic Sites 1&2
  • HSIP 2025 Project 1 - Kalamath St and 6th Ave/8th Ave Signal Rebuild
    Signal Rebuild Design
  • HSIP 2025 Project 2 - 38th Ave and Monaco NTS
    Signal Rebuild Design
  • HSIP 2025 Project 3 - 11th Ave and Quebec St Signal Rebuild
    Signal Rebuild Design

Q2 2024

  • Park Improvements - Boyd Walks
    Boyd Walks
  • Park Improvements - Ferguson Playground
    Replace aging Playground

Construction Services (Projected)

Q2 2023

  • 6th Avenue V-160_161 Repair Rehabilitation
    Repairs of conduits, drainage pipes, and beam structural coatings as a result of fire below in the railroad yard.
  • 2019 - Red Rocks Roadway Drainage Improvements
    Roadway and Drainage Improvements
  • 2022 - 4600 E. 48th Ave - Phase 3
    Adding some bathroom ADA work and Tenant Improvements clinic.
  • 2022 - 5060 Logan Parks Maintenance Facility
    Interior Maintenance Facility Renovation
  • 2022 - Arts Complex - Galleria Restaurant (Olive & Finch)
    Restaurant at the existing backstage coffee.
  • 2022 - Zoo Operations Building - Updates
    Replace roof, siding, add parking blocks and make roof repairs as needed.
  • 2022 FIT CPC Work Order Package
    Roof ladder / fall protection and Salt Dome pavement replacement.
  • Coliseum Backstage Restroom Renovation/ADA Improvements
    Restroom upgrades and addition of a wellness room
  • Coliseum Roof Repairs
    Coliseum roof repairs.
  • CTN-3 Citywide Bike - Clayton St (PBL)
    Bikeway improvements.
  • CTN-3 Citywide Bike - E 49th from Clayton (NBL)
    Bikeway improvements.
  • ZILM40; Zuni, Inspiration Pt, Lindsley, Magna Carta Parks & 40th Ave
    Improvements.
  • Jackson St. System, Phase 2
    The Jackson St. Storm Phase 2 project is a large storm system that extends from 14th Ave and Jackson Street to near Hale Parkway along Colorado Blvd or Albion St.
  • General Storm - Antero Peak
    The Antero Peak General Storm project consists of storm improvements on South Adams Way in the Wellshire neighborhood and Stuart Street in the West Colfax neighborhood.

Q3 2023

  • 56th Avenue MB-790 Repair/Rehabilitation
    Concrete and steel construction
  • Wastewater Restack Phase 2
    Level 2 renovation
  • Athmar Branch Library Renovation
    Expand and renovate the Athmar Branch Library
  • Ross-Barnum Branch Library Renovation
    Expand and renovate the Branch Library.
  • 2022 - CCC - Camp Phase 3
    Mess Hall and Barracks 1a & 1b Restoration at Morrison.
  • Park Improvements - Cheesman Walks
    Replace existing deteriorated Walks
  • Park Improvements - La Raza Playground
    Columbus Playground
  • Park Improvements - St Patricks Playground
    This project will replace an aging playground.
  • Passenger Amenity Program – Bus Stop Package 2
    Improvements to high need bus stops within the neighborhoods of the SW Denver area.
  • Central Street Improvements (Central Street Promenade)
    Central Street Improvements (Central Street Promenade)
  • GES Sidewalk - Lincoln Underpass
    This project will remove the wing walls and widen sidewalks at Lincoln St underneath I-70 to create a brighter, more friendly pedestrian/bicyclist experience.
  • Tennessee & Oneida Storm Phase 2
    The project Tennessee and Oneida Phase 2 extends from Phase 1 that ended at E. Mississippi and S. Kearney. Phase 2 will continue along E. Mississippi.

Q4 2023

  • 2020 - Park Avenue Evidence Relocation
    Interior renovation for evidence storage
  • CPC Fleet Security Improvements & Site Lighting, Osage & Cherry Creek Site Safety Improvements
    Site Safety Improvements and Lighting
  • Pauline Robinson Library Renovation
    Expand and renovate the Pauline Robinson Branch Library.
  • Schlessman Branch Library Renovation
    Expand and renovate the Branch Library.
  • 2021 - Council Chambers - Remodel
    Council Chamber Remodel
  • Capitol Hill/Civic Center NTMP Project Package
    Construct NTMP projects resulting from in-house NTMP-lite in the Capitol Hill and Civic Center neighborhoods.
  • Quebec 13th to 26th Multimodal Improvements
    Construct ADA compliant sidewalks, bus stops on Quebec 12th Ave. to Montview and 17th Ave. Monaco to Rosemary and signal replacement at 17th and Quebec.

Q1 2024

  • 2022 - CCB NW Cherokee St. Exit Ramp
    Ramp improvements.
  • Eugene Field Branch Library Renovation
    A renovated and upgraded Eugene Field Branch Library with better amenities to more adequately suit the needs of the community.
  • Ross-Broadway Branch Library Renovation
    Expand and renovate the Ross-Broadway Branch Library to better serve the community while maintaining the historic character of the building.
  • Ross-University Hills Branch Library Renovation
    Renovate and update Ross-University Hills Branch Library to better serve the needs of the community.
  • Hampden Branch Library Renovation
    Expand and renovate the Hampden Branch Library.
  • Art/Coll Repaving - 22nd St (Curtis St to Wewatta St)
    2.31 Lane Miles of Arterial Paving
  • Art/Coll Repaving - 38th St (Arkins Ct to E 45th Ave)
    1.11 Lane Miles of Arterial Paving
  • Art/Coll Repaving - 7th St (W Colfax Ave to Auraria Pkwy)
    1.27 Lane Miles of Arterial Paving
  • Art/Coll Repaving - California St (14th St to 19th St)
    1.36 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Central St (18th St to W 32nd Ave)
    0.62 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Delgany St (Park Ave W to Arkins Ct)
    1.87 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Delgany/Denargo/Arkins Ct (Park Ave W to 31st St)
    This project will perform arterial/collector repaving as deferred maintenance. Limits for this project are: Delgany/Denargo/Arkins, between Park Avenue West and East 31st street.
  • Art/Coll Repaving - E 1st Ave (N Downing St Pkwy to N University Blvd)
    4.29 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 2nd Ave (N Steele St to N Colorado Blvd)
    1.71 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 38th Ave (COLI to N Himalaya Rd)
    1.20 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 40th Ave (N Chambers Rd to COLI)
    2.56 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 46th Ave (N Washington St to N Dahlia St)
    1.52 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 48th Ave (N Vasquez Blvd to E 46th Ave Access)
    1.69 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E 52nd Ave (N Colorado Blvd to N Dahlia St)
    1.11 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E Alameda Ave (S Dahlia St to S Holly St)
    2.54 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E Andrews Dr (N Chambers Rd to E 40th Ave)
    0.55 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E Stapleton North Dr (N Dahlia St to I-70)
    2.90 Lane Miles of Arterial Paving
  • Art/Coll Repaving - E Stapleton South Dr (Colorado Blvd to Monaco Pkwy)
    3.80 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Kittredge/Bolling/Airport Way, between East 40th Ave and East 40th Ave
    This project will perform arterial/collector repaving as deferred maintenance. Limits for this project are: Kittredge/Bolling/Airport Way, between East 40th Ave and East 40th Ave.
  • Art/Coll Repaving - Morrison Rd (W Colfax Ave to N Federal Blvd)
    2.16 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Airport Way (E 40th Ave to E Bolling Dr)
    1.74 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Bryant St (W 5th Pl to N Canosa Ct)
    1.38 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Dahlia St (E 38th Ave to E Smith Rd)
    1.75 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Eliot St (W 47th Ave to N Eliot St)
    2.20 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Fox St (Park Ave W to W 39th Ave)
    1.47 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Franklin St (RRX to CDS)
    1.94 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Globeville Rd (Park Ave W to Unpass)
    1.32 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Havana Way (E 26th Ave to I-70)
  • Art/Coll Repaving - N Holly St (E Smith Rd to E 48th Ave)
    2.49 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Kalamath St (Ramp to N Speer Blvd)
    7.65 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Kittredge St (E 40th Ave to E Bolling Dr)
    1.33 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Kittredge St (Green Valley Ranch Blvd to E 53rd Ave)
    1.63 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Lincoln St (E Ellsworth Ave to E 5th Ave)
    0.87 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Quebec St (E 1st Ave to E 6th Ave)
    2.52 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Roslyn St (E 53rd Pl to E 56th Ave)
    0.92 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Roslyn St (N Syracuse St to E 32nd Ave)
    1.71 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Santa Fe Dr (RRX to N Speer Blvd)
    3.24 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Syracuse St (E 11th Ave to Roslyn St)
    This project will perform arterial/collector repaving as deferred maintenance. Limits for this project are: North Syracuse Street, between East 11th Avenue and Roslyn Street.
  • Art/Coll Repaving - N Tejon St (Boulder St to W 48th Ave)
  • Art/Coll Repaving - N Washington St (E 45th Ave to E 46th Ave)
    0.75 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N Yampa St (E 68th Ave to E 71st Ave)
    1.31 Lane Miles of Arterial Paving
  • Art/Coll Repaving - N York St (E 11th Ave to E Colfax Ave)
    1.26 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Park Ave (E Colfax Ave to E 20th Ave)
    1.85 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Rockmont Dr (19th St to CDS)
    0.75 Lane Miles of Arterial Paving
  • Art/Coll Repaving - S Holly St (E Exposition Ave to Florida Ave)
    6.93 Lane Miles of Arterial Paving
  • Art/Coll Repaving - S Logan St (Median to E Mississippi Ave)
    2.44 Lane Miles of Arterial Paving
  • Art/Coll Repaving - S Monaco St Pkwy (E Mississippi Ave to E Colorado Dr)
    1.78 Lane Miles of Arterial Paving
  • Art/Coll Repaving - W 12th Ave (N Broadway to N Speer Blvd)
    1.22 Lane Miles of Arterial Paving
  • Art/Coll Repaving - Walnut St (W Colfax Ave to 7th St)
    1.42 Lane Miles of Arterial Paving
  • Hampden Corridor Multimodal Improvements Phase 2
    Hampden Corridor Multimodal Improvements Phase 2 Project
  • Westwood and Cole Travel Plans
  • Bronco Bridge, 19th Ave Bridge, Guardrail Repair & Franklin St. Bridge Rehab Design Project
    Concrete deck sealing, expansion joint gland replacement, miscellaneous concrete flatwork, HMA mill and overlay, painting system, detailed inspection of bridges, etc.
  • 2020 - Martinez Park - Phase 1 Design
    Renovation of existing park to upgrade playgrounds and add new amenities