1. Q: Do these requirements apply to my project?
A: Yes, if the project meets either of these criteria:
- A new building or and existing building adding or demolishing more than 500 square feet.
- An existing building modifying (tenant finish/alteration/renovation) over 2,500 square feet.
2. Q: I'm a subcontractor and only need a trade permit (Electrical, Plumbing, Mechanical, Fire Alarm, Fire Sprinkler, Access Control, Boiler/AC, Roofing) - do these requirements apply to my permit?
A: No, the URCO waste diversion requirements only apply to demolition, residential construction and commercial construction permits that meet certain criteria.
3. Q: What if there are not 3 materials available to recycle from the project?
A: If less than 3 materials are available to recycle, a modification to adjust the minimum number of materials may be submitted prior to permit issuance.
4. Q: Do I have to pay the waste diversion security deposit?
A: In most circumstances, yes, the refundable security deposit is required to ensure proper waste diversion from the landfill to recycling or reuse facilities. In rare cases, prior to the issuance of a permit, the contractor may apply for a reduction or exemption if the cost of diversion is disproportionate to the value of the project.