Jackson Street Storm Drain System Phase 3 -Design

The Jackson Street Storm Drain Project is increasing capacity to manage stormwater and reduce flood risk in the Upper Montclair Drainage Basin which channels and drains stormwater in east central Denver. It is Denver’s largest stormwater basin without an open drainage channel. The overall project installs larger-capacity stormwater pipes to reduce nuisance flooding in the areas east and west of Colorado Blvd between E. Colfax Avenue, E. 12 Avenue, and Hale Parkway. The project was divided into three phases, with Phases 1 and 2 now complete and Phase 3 currently in design.

Phase 3, the final phase of the project, will extend the storm system from 13th Avenue under Albion Street to E 12 Avenue and Hale Parkway (see map). This phase terminates in Hale Parkway where it will connect to future stormwater management improvements.

In late 2026, through a separate project, DOTI also plans to improve mobility on E 12th Avenue from Madison Street to Monaco Parkway, including the 12 Avenue segment between Colorado Blvd and Ash Street by redoing medians, striping, and adding candlesticks for bike lanes.

Map of Phase 3

Jackson Street Storm System Phase 2 – Completed 2025

Phase 2 of the project installed larger storm sewer pipes starting at the intersection of E 14th Avenue and Jackson Street, moving east and tunneling underneath Colorado Blvd, then heading south to the intersection of Colorado Blvd and 13th Ave.


Photo Gallery

Crews paving NJH parking lot

Crews paving National Jewish Health parking lot

Crews completed irrigation/landscaping

Completed irrigation and landscaping work at the Jackson Street Storm project site.

Landscaping progressed along Colorado Blvd

Completed landscaping work along Colorado Blvd.

Plantings along E 13th

Landscaping crew has begun planting along E. 13th Avenue

Irrigation crews worked on tree planters on 13th

Irrigation crews working in the tree planters on E. 13th Ave.

New crosswalk at 13th and Colorado

New crosswalk at 13th and Colorado intersection

 

Jackson Street Storm System Phase 1 – Completed 2020

Phase 1 of the project installed pipe under E. Colfax Ave at Jackson Street, continuing south beneath National Jewish Health’s parking lot and along E. 14th Ave between Jackson and Harrison Streets.