The City and County of Denver's annual concrete maintenance program is working to improve Denver's neighborhood sidewalk network in three ways:
Pedestrian Ramps: According to standards set by the Americans with Disabilities Act (ADA), newly constructed or altered streets must contain curb ramps. As a result, Street Maintenance’s Annual Concrete Program will prioritize the installation of ADA pedestrian ramps in all locations where the Street Maintenance Division is planning to do street work and a ramp may need to be replaced. Performing ramp improvements before the street work is done saves money, preventing new street work from being damaged by ramp construction. ADA accessibility is mandated at all intersections.
Curb and Gutter Repair: Similarly, reported curb and gutter damage will be inspected and any necessary repairs will be prioritized accordingly. The City’s goal is to perform repairs prior to, or in conjunction with, the annual paving program and address spot repairs based upon severity and coordination with other requests to allow the work to be performed in an efficient manner.
Repair Existing Sidewalk: In 2022, Denver began incorporating sidewalk repair work into its annual concrete maintenance program. This initiative replaced the Neighborhood Sidewalk Repair Program that DOTI launched in 2018 and paused in 2020 amid the economic hardships created by the COVID-19 public health crisis. The new approach is rooted in realizing the efficiencies that come with utilizing a contractor that’s already mobilized and onsite doing other concrete work. Locations considered for sidewalk repairs will be established annually in conjunction with concrete repair work happening in advance of street paving, with priority given to equity areas and the criteria that furthers our community’s mobility goals (such as improving segments along the high injury network and that connect to transit, schools and other destinations).
Notification of Repair Work
In the event the sidewalk adjacent to your property is scheduled to be repaired, receive new pedestrian ramps, or have the curb and gutter repaired the construction contractor will deliver a door hanger at least two (2) days prior to construction. Door hangers include contact information for the City Project Manager and construction company. Homeowners are advised to keep their door hangers until construction is complete.
Weekly Construction Update
There will be no planned ADA ramp construction this week
A door hanger is placed on homes and businesses if an ADA pedestrian ramp or other concrete work is about to be performed adjacent to your property. Before construction starts, a City project manager requests a Survey for the work area and then a Professional Land Surveyor will make note of any existing survey markers. NO PARKING signs will be placed in the work area 24-48 hours in advance to allow clear access for the necessary equipment. Weather permitting, ADA ramps usually take 3 to 7 days to complete once actual construction begins.
All contact information is on the door hanger and on this website. See the sample image of the door hanger provided.
For more detailed information about the construction process and timing, see the information under “What to Expect During Concrete Construction” on this page.
PLEASE HOLD ONTO YOUR DOOR HANGER UNTIL ALL CONSTRUCTION IS COMPLETED and you are confident that any landscape or sprinkler problems resulting from concrete construction have been resolved. Please feel free to contact the Contractor, the City’s Project Manager or the City’s Concrete Hotline if an issue arises or if you have any questions.
If your street is scheduled for ramp or concrete installation, please read the information under "What to Expect During Concrete Construction."
If your street is scheduled for ramp or curb/gutter repair, the following information outlines the typical steps in the process.
Before Construction Begins
Professional land surveyors locate and tie-out any documented survey markers so they can be re-established after construction. All construction and repair work is planned only within the City’s Right-of Way. Nearby underground utilities are located. If no conflicts are anticipated, a green “NF” — signifying “None Found” — will be spray painted on the sidewalk corner. Temporary pink spray paint will be used to mark off the areas of asphalt and concrete to be excavated during concrete work. The City Project Manager may come by to look at the site. Landscaping on the corners and any potential resident landscape conflicts are noted. The contractor obtains permits for Street Occupancy, Street Closure and Barricade plans.
Concrete contractor construction firms that specialize in ADA ramps and concrete flatwork perform the ramp installation under the supervision of the City Project Manager. In advance of construction, no parking signs will be placed 24-48 hours in advance and saw cutters may put superficial cuttings in the asphalt to separate the areas of asphalt and concrete to be excavated. It is safe to park and drive on this part of the road after the cuts are made. This part of the process may occur days or weeks in advance of any construction and should not cause any disruption to daily resident activity.
- Homeowners with possible landscape conflicts typically receive a door hanger five (5) days in advance of construction to give residents the opportunity to remove or protect special plantings or other items that might be impacted during construction.
- Homes without landscaping conflicts will receive door hangers at least two (2) days prior to construction. Door hangers include contact information for the City Project Manager and the construction company.
For safety reasons, it is the City’s policy to pave the small triangular area between the two setback sidewalks at the corners. The property owner is responsible for the maintenance of this area.
- If you prefer to retain existing landscaping in this corner area and are willing to be responsible for maintenance, please call the City Project Manager to request leaving this area unpaved.
No Parking signs will be placed on the road 24-48 hours in advance. At this point, weather permitting, construction is ready to begin.
Actual Construction of Ramp or Curb/Gutter Repair
If saw cutters have not already been to the site, they will arrive to prepare the site for concrete and asphalt removal. The asphalt removed extends about 24 inches out from the street gutter. The asphalt is excavated along with the existing curb, gutter and immediate sidewalk area to make room for the new ramp. For curb/gutter repair only, the concrete curb/gutter will be removed.
“No Parking” signs will indicate that it is not possible to park in the immediate area during construction. Cars are often able to drive down the street with guidance from the construction crew.
Once excavation is completed and materials have been hauled away, wooden or steel “forms” are installed to help shape the concrete as it is being poured. For ramps, the soil is graded to the appropriate slope for the ramp and for proper drainage of stormwater. The concrete can then be poured.
- The process of saw cutting, excavating and hauling, creating the forms, grading the soil and pouring the concrete for the curb, gutter, affected sidewalk and ramp takes approximately 2 to 4 days. Construction tape and barriers are put up while the concrete cures.
- Depending on the weather, curing can take approximately 1 to 3 days. During colder temperatures, construction blankets may be placed over the concrete to speed up the curing process.
After Concrete Construction is Complete
Once the concrete cures, the forms are removed. The excavated area is backfilled and asphalt is patched along the new curb. Once "no parking" signs are removed, the ramp or new curb/gutter is completed to the point where it is safe for residents to use the area, drive their cars freely and park on the street.
- Landscape repairs to sprinklers, grass and gardens usually takes place within 7 days of pouring the concrete. With concrete construction in winter months, some landscape repairs may be held off until spring.
- Surveyors have up to 6 months to restore survey markers disturbed during construction.
Important: Please keep the notice for up to one year until all concrete and/or landscape and sprinkler repairs are resolved.
Before a curb and gutter is scheduled to be repaired or replaced, residents will receive 48 hours advance notice of the upcoming work and no parking signs will be placed on the block. Crews will only work on one side of a city block at a time. Once one side of all the city blocks in a project area are repaired, construction crews will then proceed in the same fashion on the opposite side of the street. Curb and gutter construction on one side of a single block takes approximately five days.
If residents have street facing driveways, residents may lose access to their driveways for 3-5 days while new curb and gutter is being poured. In some cases, the construction crew may have to demolish and replace a residential driveway apron to fit the new curb and gutter. A driveway apron is the portion of the driveway closest to the street.
Should the resident require driveway access during construction, please notify the project manager immediately so the construction crew can try to find a temporary solution.
Construction Process
| Forty-eight hours before construction is scheduled to begin, ‘no parking’ signs will be placed on the block. A cut (saw cut) will be made in the asphalt 5 ½ feet from the curb. |
 |
|
The asphalt and concrete are removed between the curb and saw cut to a depth of six inches. For an entire block, forms are set to shape the new curb and gutter on one side of the street.
|
|
|
Concrete is usually poured on the same day as removal. Concrete will be poured Monday through Thursday
|
|
|
In some cases, a residential driveway apron may have to be removed and reconstructed to work seamlessly with the new curb and gutter. Residents can expect to lose access to their driveways for 3-5 days.
|
|
|
Not all driveway aprons will need to be removed, some can more easily integrate with the new curb and gutter.
|
|
|
Once all the concrete has been poured, the completed driveway, curb, and gutter will be a continuous structure (see example photo before forms are removed).
|
|
|
Finally, once the forms are removed, the street asphalt next to the new curb and gutter will be patched to complete the project.
|
|
Concrete repairs including issues with curb & gutters or ADA Ramps or alleys are placed on a Spot Repair list. The areas on this list are inspected by a city engineer who then codes the issue with a priority of 1, 2, 3, or 4 with 1 being a severe issue (several feet of missing or crumbling/sinking curb or gutter/ADA safety hazard, etc.) and a 4 being a minor issue (less than 2 feet of missing or crumbling curb/gutter). Cracked curb/gutter or ADA ramps are not a safety or maintenance concern. Work is done through the city systematically to try to get as many Spot Repairs done as possible at one time, so that we use our VERY LIMITED budget efficiently and effectively. Repairs are usually made on priority 1 or priority 2 issues but can take several years to be completed because there are many broken curbs or ADA ramps or alleys in the city that need repairs and we cannot predict how fast the contractor will work.
Until this issue can be resolved, if standing water or during the winter, ice/snow buildup occurs, feel free to contact 311 and request an ad-hoc street sweeper/ice-blade to handle the situation.
Professional land surveyors locate and tie-out any documented survey markers so they can be re-established after construction. All construction and repair work is planned only within the City’s Right-of Way. Concrete contractor construction firms that specialize in concrete flatwork perform the sidewalk repairs under the supervision of the City Project Manager.
Property owners will receive door hangers at least two (2) days prior to sidewalk repairs. Door hangers include contact information for the City Project Manager and the construction company.
- Homeowners with possible landscape conflicts typically receive a door hanger five (5) days in advance of construction to give residents the opportunity to remove or protect special plantings or other items that might be impacted during construction.
- Homes without landscaping conflicts will receive door hangers at least two (2) days prior to construction. Door hangers include contact information for the City Project Manager and the construction company.
“No Parking” signs will be placed on the street immediately prior to construction and remain for the duration of the project. While street parking will be restricted, the street will remain open as much as possible for cars and pedestrians. Depending on the nature of the sidewalk repair needed, concrete may be poured into forms to replace cracked or sloping sidewalk. The process of saw cutting, excavating and hauling, creating the forms, grading the soil and pouring the concrete for the affected sidewalk takes approximately 2 to 4 days. Construction tape and barriers are put up while the concrete cures.
Depending on the weather, curing can take approximately 1 to 3 days. During colder temperatures, construction blankets may be placed over the concrete to speed up the curing process. Once the concrete cures, the forms are removed, and the soil is backfilled and sprinkled with grass seed.
Landscape repairs to sprinklers, grass and gardens usually takes place within 7 days of pouring the concrete. With concrete construction in winter months, some landscape repairs may be held off until spring. Important: Please keep the construction notice for up to one year until all concrete and/or landscape and sprinkler repairs are resolved.
Concrete Ramp Construction and Location
Someone came by and sprayed paint marks on my sidewalk and street. Does this mean I am going to have a ramp constructed on my corner?
Yes, you can expect the City to either install new pedestrian ramps on your corner or fix a curb and gutter within two weeks to six months. The pink spray paint indicates where the asphalt and concrete will be excavated to create space for the ramp. For more detail, please refer to “What to Expect During Concrete Construction.”
How long will it take?
Total expected construction time should be 3 to 7 days, weather permitting. For more detail, please refer to “What to Expect During Concrete Construction."
I don’t want a ramp, why is the City building one?
Since the passage of the Americans with Disabilities Act of 1992, the City and County of Denver is obligated by federal law to install ADA ramps at locations where street improvements are made as specified by the Federal Department of Justice guidelines. Read more about the guidelines for ADA ramp installation.
Why is there a ramp on my street when the sidewalk isn’t wide enough for someone in a wheelchair to access?
ADA ramps are being installed at all corners and T-intersections where any sidewalk exists in an effort to make the City of Denver operations in compliance with the Federal ADA Act. The ADA guidelines do not currently require existing sidewalks to be widened to accommodate wheelchairs, but the City foresees the possibility that the sidewalks may be required to be widened in the future. The ADA ramps are being constructed to accommodate for the potential future widening. If there is not an improved walking surface, no ADA ramp is required.
Can you fix my sidewalk, curb, and gutter since you are already going to be here building a ramp?
The property owner is responsible for the sidewalk. Where combination curb, gutter and sidewalk exist, homeowners are responsible for the maintenance of everything behind the curb, per City Ordinance (Sec. 49-551.1). A City Project Manager can inspect the curb and gutter for hazards or flow line disruptions and determine if repairs are necessary.
I think the ramp is too flat, can you rebuild it?
The City cannot build steeper ramps as these would not comply with ADA ramp guidelines. The latest guidelines by the Federal Department of Justice Access Board recommend a slope which is flatter than previous guidelines. The Street Maintenance group can only respond to issues regarding recent or current construction of ADA ramps in accordance with the City of Denver Standard Details and Specifications document which is based on federal guidelines set forth in the ADA.
The City of Denver Street Maintenance group is not an engineering regulatory group, so we cannot change or amend the City Standard Details and Specifications.
I paid to legally mark my property line. Will those markers be replaced?
Generally, all work being done by this project is in the City’s Right-of-Way and most survey markers are off-set ties to the actual survey monuments and are mainly used by the City’s surveyor. If it appears that a survey marker you have is in the area marked for construction, please contact us by calling your City Project Manager or by leaving a message on the curb ramp hotline at (720) 460-9055. Surveyors have up to 6 months to restore survey markers disturbed during construction.
Ramps at "T" Intersections
ADA ramps are being installed at all corners, including T-intersections, where any sidewalk exists. This is not only to comply with current guidelines but also to accommodate potential future widening of sidewalks or changes to the street layout.
Typical Layout of a Ramp at a Three-Way "T" Intersection

This layout is representative of a typical "Type 2M" ramp installation at a three-way intersection. Ramp size may vary to meet grades and specifications.


ADA Ramps in Historic Neighborhoods with Red Flagstone Sidewalks
The historic designation applies to private properties in a historic district and does not confer preservation status to the sidewalks or streets. The City will NOT save, store, and replace flagstone in the City right-of-way.
Community Planning & Development: Landmark Preservation Updates
What Can I Expect During Construction?
A door hanger will notify you of impending ramp construction or concrete repair 48 hours before construction is to begin. Concrete crews will remove as many flagstone pieces as necessary to achieve the proper ramp slope as specified by federal guidelines. Additional sections of flagstone sidewalks may need to be removed to avoid excessively steep slopes. The flagstone will be removed from the construction site.
Can I keep my flagstone and use it to rebuild my sidewalk?
All existing flagstone removed for the construction of ADA ramps and re-grading of adjacent sidewalk will not be salvaged by the City. Salvage and reuse of removed flagstone is not recommended and can only be arranged between the adjacent property owner and the City’s Contractor.
Adjacent property owners wishing to keep their flagstone sidewalk must assume all responsibility for arranging with the City’s contractor to do so. The Contractor contact information is posted on this website and should also be on the door hanger placed on the front door of the adjacent property owner.
The City will NOT allow salvaged materials to be stockpiled or stored in the City right-of-way.
- Reconstruction of a City sidewalk requires a permit which must be obtained before work can begin; refer to the Denver Municipal Code for information on sidewalk construction and permits: Municipal Code Sec. 49
- Please see resources provided as part of the City's Neighborhood Sidewalk Repair Program for information on DIY sidewalk repair and flagstone providers and contractors
- Additional information regarding sidewalk reconstruction and permits can also be found through Right of Way Services.
Why doesn’t the City recommend reuse of flagstone sidewalk?
- Flagstone sidewalk slabs can weigh hundreds of pounds and are a liability and risk to handle.
- Most flagstone cannot be reset to meet current standards; see the current Criteria for Hazardous or Defective Sidewalks
- It is the adjacent property owner’s responsibility to develop and maintain the sidewalk; the City has no funding for this type of work.
- Most pieces of flagstone are unique and are not readily interchangeable without some stone cutting and fitting. Many pieces break upon removal and/or are weathered and no longer have a uniformly smooth surface.
ADA Ramps Adjacent to City-Owned Facilities (parks, recreation centers, libraries, etc.)
ADA pedestrian ramps adjacent to City-owned facilities such as parks, recreation centers, libraries, and public buildings must be a minimum of 6 feet wide or built to match the width of the adjacent sidewalk, whichever is greatest.
In City parks, where there are multi-use trails, ramp width can be increased to a maximum of 12 feet if the trail is greater than 10 feet wide.
All ramps adjacent to City-owned facilities will be installed with truncated domes (no-slip pads) made of cast iron to better withstand sweeping and snow removal equipment.
Construction and Landscaping
Will my landscaping be altered during construction? How does the City fix it?
If you have flowerbeds, plants or other special landscaping on the corner of your lot, they may be affected during construction. When special landscaping is present, residents typically receive notice of ramp installation 5 days prior to the start of construction so that sensitive or valuable plants within a couple feet of the existing walk can be removed by the resident and replanted after construction. The City’s landscape contractor specializes mainly in sprinkler repairs and sod and seeding grass lawns.
As a matter of public safety, the City’s policy is to pave over the small triangular area between the new ramps on corners where the sidewalk is set back away from the curb. If you have this area nicely landscaped and irrigated and wish to assume responsibility to maintain and keep this area safe, please notify the City’s Project Manager as soon as you receive the public notice door hanger.
Can I use my sprinklers while construction is being done?
Please avoid watering the excavation site if it is left open for concrete repair. Watering the area will delay construction. If you live in a residence directly next to the area where construction is taking place, sprinkler heads and lines on your property may have to be moved slightly to properly grade the sidewalk and build the wooden forms to shape the concrete.
Once the concrete has cured and the forms have been removed, the construction crews will move, repair, and reconnect your sprinklers. In warm weather, sprinklers will be repaired within 7 days. In the winter, the contractor may return in the spring to complete repairs.
Please keep your door hanger so that you have the contact information to resolve any outstanding landscape or sprinkler repairs after construction.
What happens to landscape Improvements and street trees on City property?
All of the curb and sidewalk is contained inside City property, which includes several feet of City property behind the walk. Our crews are instructed to keep landscape and tree removals to a minimum and to try to disturb only what is needed to install the ramp. If, however, you have installed landscape improvements on City property, the City is not responsible for replacing these improvements should they be disturbed or removed due to ramp construction.
Our inspectors can consult with homeowners in advance so that, where possible, landscaping can be safely removed by the homeowner for replanting after ramp construction is completed. In the case of mature trees, the City Forester may be called upon for additional consultation.
Further information
What About My Garden Wall or Fence?
ADA pedestrian ramp construction will only occur on City property. If a garden wall or fence is located on City property it may have to be disturbed or removed in order to accommodate construction of a pedestrian ramp or concrete repair. The City is not responsible for replacing fences or other hardscaping installed on City property.
Additional information
Construction and Street Parking
Can I park on my street while the construction is being done?
YES and NO. 24-48 hours before construction begins, the City’s contractor will put up “No Parking” signs on your block. You will not be able to park in the immediate area during the 3-7 days of construction in order to leave room for construction vehicles, materials and personnel.
However, only the immediate area around the construction site will have restricted parking. Other parts of the street may not be impacted.
Can I park in front of a new or repaired ramp?
No. A pedestrian ramp is part of the street crosswalk, and cars may not park in the crosswalk.
Where should I put trash bins out for collection during construction?
if trash, recycling, and compost are picked up in front of your residence, please move your bins across the street and out of the construction area to ensure weekly trash collection. Trash collection will resume on your side of the street once the 'NO PARKING' signs are removed.
Responsibilities for Ramp Maintenance
There is snow build–up and/or ice in the new ADA ramp adjacent to my property that is difficult to maintain, is this my responsibility?
Yes, the adjacent property owner is responsible for the development and maintenance of the sidewalk adjoining their property and the ADA ramps are simply a portion of the sidewalk modified to comply with Federal ADA standards. The resident is responsible for clearing the ramp of snow, leaves and debris.
Please see additional information at denvergov.org/snow.
Why is the ramp near my house full of dirt/sediment and trash?
It is common to have sediment in the gutter/flowline within the city streets. This often caused by changes in the velocity of the storm water as it flows down the gutter. During rain/snow melt events, the sediment is transported in the water flowing down the gutter/flowline. As the water enters the ADA ramp curb cut opening the velocity of the storm water runoff is slowed and allows the sediment to settle out within the ramp.
Maintenance/clean-up within the ramp is necessary and is the responsibility of the homeowner adjacent to the ramp.


Additional Questions
This program is for the City’s contracted maintenance and repair work only. For questions regarding new construction, remodeling, site development please contact Denver's Right of Way Services or Development Services.
If you have questions about ongoing construction, sprinkler/landscape damage, paint/markings, or other questions that aren't addressed on this page, please contact your City Project Manager or call the Concrete Hotline number listed in the sidebar.
If you would like to report a curb/gutter in need of repair or follow up on a repair request, please call 311.
If you know the name of your City Project Manager this is the most efficient way of getting information quickly. Please allow a reasonable amount of time for the project manager to respond to your message before calling the Concrete Hotline.
Derek Miles
derek.miles@denvergov.org
Amy Strouthopoulos
amy.strouthopoulos@denvergov.org
Lindsey Chieduko
lindsey.chieduko@denvergov.org
Finch Pluto
finch.pluto@denvergov.org
If you know the name of the contractor working on your project, a list of contractors and their contact information is below:
Fasick Concrete, Inc.
(303) 419-2455
Keene Concrete, Inc.
(303) 227-1901
Martin Marietta
(720) 593-2625
Silva Construction, Inc.
(720) 550-8175
Chato's Concrete, LLC
(720) 252-7959
Week of of November 10, 2025 (weather permitting)
- Green Valley Ranch: ADA Ramp and Crosspan repairs on E 51st Ave between N Quentin St and N Tucson Way (Keene) Project Manager: Finch Pluto
- Cole: ADA Ramp, Alley, Curb & Gutter and Crosspan repair from 35th to 40th and High St to York St (Silva) Project Manager: Lindsey Chieduko
Week of October 27, 2025
- Union Station: Jointed concrete panel replacement on Little Raven Street from 16th to 21st Avenues (Silva) Project Manager: Derek Miles
Week of October 13, 2025 (weather permitting)
- City Park: Jointed concrete panel replacement on 23rd Ave. from Denver Zoo Rd. to Colorado Blvd. (Silva). Project Manager: Derek Miles
- Union Station: Jointed concrete panel replacement on Little Raven Street from 16th to 21st Avenues (Silva) Project Manager: Derek Miles
Week of October 6, 2025 (weather permitting):
- City Park: Jointed concrete panel replacement on 23rd Ave. from Denver Zoo Rd. to Colorado Blvd. (Silva). Project Manager: Derek Miles
- Capitol Hill: ADA ramp installation on Downing Street at 11th and 12th Avenue (Silva) Project Manager: Bryce Miller
Week of September 29, 2025 (weather permitting):
- City Park: Jointed concrete panel replacement on 23rd Ave. from Denver Zoo Rd. to Colorado Blvd. (Silva). Project Manager: Derek Miles
- Hampden: Curb and Gutter, ADA Ramp and Crosspan repair work on E Girard Ave from S Dayton St to S Havana St (Keene Concrete) Project Manager: Finch Pluto
September 22, 2025 (weather permitting):
- University: ADA Ramp, Curb & Gutter repair work between S Gilpin St and S High St from E Asbury Ave to E Iliff Ave (Denver Concrete Works) Project Manager: Derek Miles
- Green Valley Ranch: ADA Ramp, Cross Pan and Curb & Gutter Repair work between E 48thPl and E 53rdAve from N Hannibal St to N Memphis St (Keene Concrete) Project Manager: Finch Pluto
- Hampden South: Jointed Concrete Panel replacement on DTC Blvd from Tufts to Union Avenues (Silva) Project Manager: Derek Miles
- City Park: Jointed Concrete Panel replacement on 23rd Avenue from Denver Zoo Rd to Colorado Blvd (Silva) Project Manager: Derek Miles
Week of September 15, 2025 (weather permitting):
- University: ADA Ramp, Curb & Gutter repair work between S Gilpin St and S High St from E Asbury Ave to E Iliff Ave (Denver Concrete Works) Project Manager: Derek Miles
- Green Valley Ranch: ADA Ramp, Cross Pan and Curb & Gutter Repair work between E 48th Pl and E 53rd Ave from N Hannibal St to N Memphis St (Keene Concrete) Project Manager: Finch Pluto
Week of September 1, 2025 (weather permitting)
- University: ADA Ramp, Curb & Gutter repair work between S Gilpin St and S High St from E Asbury Ave to E Iliff Ave (Denver Concrete Works) Project Manager: Derek Miles
- Mar Lee: ADA Ramp, Cross Pans, SW repair work from W Mississippi Ave to W Louisiana Ave between S Vrain St and S Irving St (Silva Construction) Project Manager: Bryce Miller
Week of August 18, 2025 (weather permitting):
- Montclair: ADA Ramp, Curb & Gutter, Cross Pan, and Alley Apron repair work on 13th Ave and 14th Ave between Fairfax St and Locust St (Keene Concrete) Project Manager: Finch Pluto
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Sloan Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
- Sloan Lake: Alley repair work in the block bounded by W Byron Place, W 25th Ave, Vrain St, and Winona St (Silva Construction) Project Manager: Bryce Miller
- University: ADA Ramp, Curb & Gutter repair work between S Gilpin St and S High St from E Asbury Ave to E Iliff Ave (Denver Concrete Works) Project Manager: Derek Miles
Week of August 11, 2025 (weather permitting):
- Montclair: ADA Ramp, Curb & Gutter, Cross Pan, and Alley Apron repair work on 13th Ave and 14th Ave between Fairfax St and Locust St (Keene Concrete) Project Manager: Finch Pluto
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Sloan's Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
Week of August 4, 2025 (weather permitting):
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Sloan's Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
Week of July 28, 2025 (weather permitting):
- Central Park: Round-a-bout repairs at intersection of E 21st Ave and N Willow St (Denver Concrete Works) Project Manager: Derek Miles
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Sloan's Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
Week of July 21, 2025 (weather permitting):
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Holly St between 26th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Ruby Hill: Curb & Gutter, Cross Pan, Alley Apron and Sidewalk repair from W Florida Ave to W Evans Ave between S Zuni St and S Quivas St, spot repair at Evans and Bannock Streets (Denver Concrete Works) Project Manager: Bryce Miller
- West Highland: Alley repair bounded by Speer Blvd/Irving St and W Fairview Pl and Grove St (Denver Concrete Works) Project Manager: Derek Miles
- Sloan's Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
Week of July 14, 2025 (weather permitting):
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Dahlia St to Holly St between 26th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Ruby Hill: Curb & Gutter, Cross Pan, Alley Apron and Sidewalk repair from W Florida Ave to W Evans Ave between S Zuni St and S Quivas St, spot repair at Evans and Bannock Streets (Denver Concrete Works) Project Manager: Bryce Miller
- West Highland: Alley repair bounded by Speer Blvd/Irving St and W Fairview Pl and Grove St (Denver Concrete Works) Project Manager: Derek Miles
- Sloan's Lake: ADA Ramp, Curb & Gutter, and Alley Apron repair work on 24th & 25th Ave between N Lowell Blvd and N Federal Blvd (Silva Construction) Project Manager: Lindsey Chieduko
Week of July 7, 2025 (weather permitting):
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Albion St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Ruby Hill: Curb & Gutter, Cross Pan, Alley Apron and Sidewalk repair from W Florida Ave to W Evans Ave between S Zuni St and S Quivas St, spot repair at Evans and Bannock Streets (Denver Concrete Works) Project Manager: Bryce Miller
- West Highland: Alley repair bounded by Speer Blvd/Irving St and W Fairview Pl and Grove St (Denver Concrete Works) Project Manager: Derek Miles
Week of June 30, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Albion St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Sloan's Lake: Alley repair area bounded by W 22nd Ave, W 21st Ave, Hooker St and Grove St (Denver Concrete Works)
Week of June 23, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Albion St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Villa Park: Median Reconstruction at 7th & Federal: (Keene Concrete) Project Manager: Finch Pluto
- Virginia Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of June 16, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Villa Park: Median Reconstruction at 11th & Federal and 7th & Federal: (Keene Concrete) Project Manager: Finch Pluto
- Virginia Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of June 9, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Park Hill: ADA Ramp, Curb & Gutter, Cross Pan, Bus Pad, and Alley Apron repair work from Albion St to Leyden St between 25th Ave and E Montview Blvd (Keene Concrete) Project Manager: Finch Pluto
- Virginia Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of June 2, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter Repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter Repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of May 27, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter Repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter Repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of May 19, 2025 (weather permitting):
- Virginia Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter Repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of May 12, 2025 (weather permitting):
- Virginia Village: ADA Ramp, Sidewalk, Bus Pad, and Curb & Gutter Repair from E Florida Ave to E Iliff Ave between S Monaco St Pkwy and S Trenton Ct (Denver Concrete Works) Project Manager: Derek Miles
Week of May 5, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter Repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
Week of April 28, 2025 (weather permitting):
- Capitol Hill: ADA Ramp, Sidewalk, Alley Apron, and Curb & Gutter Repair from E 13th Ave to E 1st Ave between N Broadway St and N Gaylord St (Silva Construction) Project Manager: Bryce Miller
- Overland: ADA Ramp, Crosspans, Alley Apron, and Curb & Gutter Repair from S Delaware St to S Broadway between W Evans Ave and W Yale Ave (Silva Construction) Project Manager: Bryce Miller
Week of April 21, 2025 (weather permitting):
- Overland: ADA Ramp, Crosspans, Alley Aprons and Curb & Gutter Repair from S Delaware St to S Broadway between W Evans Ave and W Yale Ave (Silva Construction) Project Manager: Lindsey Chieduko
Week of April 14, 2025 (weather permitting):
- Berkeley: Sidewalk, ADA Ramp, and Curb & Gutter Repair from N Lowell Blvd to N Grove St between W 44th Ave to W 46th Ave (Silva Construction) Project Manager: Lindsey Chieduko
Week of April 7, 2025 (weather permitting):
- Berkeley: Sidewalk, ADA Ramp, and Curb & Gutter Repair from N Lowell Blvd to N Green Ct between W 44th Ave to W Denver Pl (Silva Construction) Project Manager: Lindsey Chieduko
Week of March 24, 2025 (weather permitting):
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Green Ct between W Wesley Ave and W Yale Ave (Silva Construction) Project Manager: Lindsey Chieduko
- Berkeley: Sidewalk, ADA Ramp, and Curb & Gutter Repair from N Lowell Blvd to N Green Ct between W 44th Ave to W Denver Pl (Silva Construction) Project Manager: Lindsey Chieduko
Week of March 17, 2025 (weather permitting):
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Hazel Way between W Evans Ave and W Iliff Ave (Silva Construction) Project Manager: Lindsey Chieduko
Week of March 10, 2025 (weather permitting):
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Hazel Way between W Evans Ave and W Iliff Ave (Silva Construction) Project Manager: Lindsey Chieduko
Week of March 3, 2025 (weather permitting):
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Hazel Way between W Evans Ave and W Iliff Ave (Silva Construction) Project Manager: Lindsey Chieduko
Week of February 24, 2025 (weather permitting):
- Globeville: Curb Ramp Repair from N Galapago St to N Elati St between W 39th Ave and W 42nd Ave (Keene Construction) Project Manager: Derek Miles
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Green Ct between W Evans Ave and W Yale Ave (Silva Construction) Project Manager: Lindsey Chieduko
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of February 17, 2025 (weather permitting):
- Globeville: Curb Ramp Repair from N Galapago St to N Elati St between W 39th Ave and W 42nd Ave (Keene Construction) Project Manager: Derek Miles
- Harvey Park: Sidewalk, ADA Ramp, Curb & Gutter, and Crosspan Repair from S Lowell Blvd to S Green Ct between W Evans Ave and W Yale Ave (Silva Construction) Project Manager: Lindsey Chieduko
- Highlands: Green infrastructure reconstruction of the intersection at Tejon and Erie Streets (Keene Concrete) Project Manager: Derek Miles
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of February 10, 2025 (weather permitting):
- Highlands: Green infrastructure reconstruction of the intersection at Tejon and Erie Streets (Keene Concrete) Project Manager: Derek Miles
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of February 3, 2025 (weather permitting):
- Bonnie Brae: ADA ramp, alley pan, curb & gutter, and cross pan repairs along Bonnie Brae Blvd from S University Blvd to S Steele St (Keene Concrete) Project Manager: Derek Miles
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of January 27, 2025 (weather permitting):
- Bonnie Brae: ADA ramp, alley pan, curb & gutter, and cross pan repairs along Bonnie Brae Blvd from S University Blvd to S Steele St (Keene Concrete) Project Manager: Derek Miles
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of January 20, 2025 (weather permitting):
- Bonnie Brae: ADA ramp, alley pan, curb & gutter, and cross pan repairs along Bonnie Brae Blvd from S University Blvd to S Steele St (Keene Concrete) Project Manager: Derek Miles
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
Week of January 13, 2025 (weather permitting):
- Bonnie Brae: ADA ramp, alley pan, curb & gutter, and cross pan repairs along Bonnie Brae Blvd from S University Blvd to S Steele St (Keene Concrete) Project Manager: Derek Miles
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
Week of January 6, 2025 (weather permitting):
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
2024 Weekly Schedule History
Weeks of December 23 and 30, 2024 (weather permitting):
- N/A due to Christmas holidays
Week of December 16, 2024 (weather permitting):
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
- Westwood: Alley panel replacement surrounding streets S Wolff St / S Vrain St / W Exposition Ave / W Ada Pl (Silva) Project Manager: Lindsey Chieduko
Week of December 9, 2024 (weather permitting):
- Barnum: Sidewalk and ADA Ramp Repair on W Alameda Ave from S Stuart St to S Lowell Blvd (Silva) Project Manager: Lindsey Chieduko
- Barnum: Sidewalk and ADA Ramp Repair from S Zenobia St to S Utica St between W Bayaud Ave and W Alameda Ave (Silva) Project Manager: Lindsey Chieduko
- Hampden: Joint Concrete Panel replacement on Yosemite from Hampden to the intersection of S Yosemite St and S Syracuse Way (Keene) Project Manager: Derek Miles
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Washington Park: Sidewalk and ADA Ramp Repair from S Franklin St to S York St between E Alameda Ave and E Center Ave (Silva) Project Manager: Lindsey Chieduko
- Westwood: Alley panel replacement surrounding streets S Wolff St / S Vrain St / W Exposition Ave / W Ada Pl (Silva) Project Manager: Lindsey Chieduko
Week of November 18, 2024 (weather permitting):
- Hampden South: Joint Concrete Panel Replacement on DTC Blvd (southbound) from Union Ave to Belleview (Silva) Project Manager: Lindsey Chieduko
- Harvey Park: Combination sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St and S Lowell Blvd (Silva) Project Manager: Finch Pluto
- Hampden: Joint Concrete Panel replacement on Yosemite from Hampden to the intersection of S Yosemite St and S Syracuse Way (Keene) Project Manager: Derek Miles
Week of November 4, 2024 (weather permitting):
- Hampden South: Joint Concrete Panel Replacement on DTC Blvd (southbound) from Union Ave to Belleview (Silva) Project Manager: Lindsey Chieduko
- Harvey Park: Combo Sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Stuart St to S Lowell Blvd (Silva) Project Manager: Finch Pluto
Week of October 28, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Central Park: Panel replacement at 9950 E 40th Ave (Keene) Project Manager: Derek Miles
- Hampden: Joint Concrete Panel replacement on Yosemite to Hampden to the intersection of S Yosemite St and S Syracuse Way (Silva) Project Manager: Lindsey Chieduko
- Hampden South: Joint Concrete Panel Replacement on DTC Blvd (southbound) from Union Ave to Belleview (Silva) Project Manager: Lindsey Chieduko
- Harvey Park: Combo Sidewalk and ADA Ramp repair from W Dartmouth Ave to W Hamilton Pl between S Wolff St and S Vrain St (Silva) Project Manager: Finch Pluto
Week of October 21, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Central Business District: Curb & Gutter and Sidewalk repair from N Fox St to Broadway between W 14th Ave and W 12th Ave (Silva) Project Manager: Finch Pluto
- Central Park: Panel replacement on MLK Jr. Blvd from Akron to Beeler Streets (Keene) Project Manager: Derek Miles
- Denver Health Hospital Authority: Driveway, gutters, and sidewalk repairs will begin on October 18 (Silva) Project Manager: Finch Pluto
Week of October 14, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Central Business District: Curb & Gutter and Sidewalk repair from N Fox St to Broadway between W 14th Ave and W 12th Ave (Silva) Project Manager: Finch Pluto
- Central Park: Panel replacement on MLK Jr. Blvd from Akron to Beeler Streets (Keene) Project Manager: Derek Miles
- Denver Health Hospital Authority: Driveway, gutters, and sidewalk repairs will begin on October 18 (Silva) Project Manager: Finch Pluto
- Highlands: ADA ramps and curb/gutter repairs from W 32nd Ave to W 29th Ave between N Clay St to N Zuni St (Silva) Project Manager: Lindsey Chieduko
- Mar Lee: ADA ramps, Combo repair from Tennyson to Lowell Street between Morrison Road and Kentucky Ave (Silva) Project Manager: Lindsey Chieduko
- Westwood: ADA ramps and alley pan and combo SW repairs from S Stuart St to S Federal Blvd between W Alameda Ave and W Gill Pl (Keene) Project Manager: Derek Miles
Week of October 7, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Central Business District: Curb & Gutter and Sidewalk repair from N Fox St to Broadway between W 14th Ave and W 12th Ave (Silva) Project Manager: Finch Pluto
- Central Park: Panel replacement on MLK Jr. Blvd from Akron to Beeler Streets (Keene) Project Manager: Derek Miles
- Highlands: ADA ramps and curb/gutter repairs from W 32nd Ave to W 29th Ave between N Clay St to N Zuni St (Silva) Project Manager: Lindsey Chieduko
- Mar Lee: ADA ramps, Combo repair from Tennyson to Lowell Street between Morrison Road and Kentucky Ave (Silva) Project Manager: Lindsey Chieduko
- Westwood: ADA ramps and alley pan and combo SW repairs from S Stuart St to S Federal Blvd between W Alameda Ave and W Gill Pl (Keene) Project Manager: Derek Miles
Week of September 30, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- City Park West: Sidewalk repair from E 20th Ave to E 25th Ave between N York St and N Franklin St (Silva) Project Manager: Finch Pluto
- Highlands: ADA ramps and curb/gutter repairs from W 32nd Ave to W 29th Ave between N Clay St to N Zuni St (Silva) Project Manager: Lindsey Chieduko
- Westwood: ADA ramps and alley pan and combo SW repairs from S Stuart St to S Federal Blvd between W Alameda Ave and W Gill Pl (Keene) Project Manager: Derek Miles
Week of September 23, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- City Park West: Sidewalk repair from E 20th Ave to E 25th Ave between N York St and N Franklin St (Silva) Project Manager: Finch Pluto
- Sloan's Lake: 26th Ave from Osceola St to Hooker St (Keene) Project Manager: Derek Miles
Week of September 16, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Berkeley: ADA ramps, curb and gutter, alley pan and sidewalk repair on Irving St from 38th to 46th Avenues (Keene) Project Manager: Derek Miles
- Skyland: Sidewalk repair from E 29th Ave to E 26th Ave between N York St and N Clayton St (Silva) Project Manager: Finch Pluto
- Sloan's Lake: 26th Ave from Osceola St to Hooker St (Keene) Project Manager: Derek Miles
Week of September 9, 2024 (weather permitting):
- Bellevue-Hale: ADA ramps and alley pan repairs from 11th Ave to Colfax Ave between Colorado Blvd and Dahlia St (Keene) Project Manager: Bryce Miller
- Berkeley: ADA ramps, curb and gutter, alley pan and sidewalk repair on Irving St from 38th to 46th Avenues (Keene) Project Manager: Derek Miles
- Skyland: Sidewalk repair from E 29th Ave to E 26th Ave between N York St and N Clayton St (Silva) Project Manager: Finch Pluto
Week of August 25, 2024 (weather permitting):
- Central Park: ADA ramps and alley pan repairs from N Clinton St to N Iola St between E 29th Ave and E 27th Ave (Keene) Project Manager: Bryce Miller
- Skyland: Sidewalk repair from E 29th Ave to E 26th Ave between N York St and N Clayton St (Silva) Project Manager: Finch Pluto
- Villa Park: ADA ramp, curb and gutter, alley pan and sidewalk repair from W 12th Ave to W 6th Ave between N Newton St and N King St (Silva) Project Manager: Finch Pluto
- Whittier: ADA ramp, curb and gutter, alley pan and sidewalk repair from MLK Blvd to E 26th Ave between Curtis St and N Humboldt St (Silva) Project Manager: Finch Pluto
Week of August 19, 2024 (weather permitting):
- Central Park: ADA ramps and alley pan repairs from N Clinton St to N Iola St between E 29th Ave and E 27th Ave (Keene) Project Manager: Bryce Miller
- Five Points: ADA ramp and sidewalk widening at 28th and Clarkson
- Skyland: Sidewalk repair from E 29th Ave to E 26th Ave between N York St and N Clayton St (Silva) Project Manager: Finch Pluto
- Whittier: ADA ramp, curb and gutter, alley pan and sidewalk repair from E 25th Ave to E 20th Ave between N Franklin St and N Gaylord St (Silva) Project Manager: Finch Pluto
- Whittier: ADA ramp, curb and gutter, alley pan and sidewalk repair from MLK Blvd to E 26th Ave between Curtis St and N Humboldt St (Silva) Project Manager: Finch Pluto
Week of August 12, 2024 (weather permitting):
- Central Park: ADA ramps and alley pan repairs from N Clinton St to N Iola St between E 29th Ave and E 27th Ave (Keene) Project Manager: Bryce Miller
Week of August 5, 2024 (weather permitting):
- Central Park: ADA ramps and alley pan repairs from N Clinton St to N Iola St between E 29th Ave and E 27th Ave (Keene) Project Manager: Bryce Miller
Week of July 29, 2024 (weather permitting):
- Hampden: ADA ramp, curb and gutter, alley pan and sidewalk repair from Holly Pl to Locust St, and S Magnolia St to S Pontiac St between E Dartmouth Ave and Hampden (Keene) Project Manager: Bryce Miller
Week of July 22, 2024 (weather permitting):
- Hampden: ADA ramp, curb and gutter, alley pan and sidewalk repair from Holly Pl to Locust St, and S Magnolia St to S Pontiac St between E Dartmouth Ave and Hampden (Keene) Project Manager: Bryce Miller
Week of July 15, 2024 (weather permitting):
- Hampden: ADA ramp, curb and gutter, alley pan and sidewalk repair from Holly Pl to Locust St, and S Magnolia St to S Pontiac St between E Dartmouth Ave and Hampden (Keene) Project Manager: Bryce Miller
Week of June 30, 2024 (weather permitting):
- Hampden: ADA ramp, curb and gutter, alley pan and sidewalk repair from S Magnolia St to S Pontiac St between E Dartmouth Ave and E Girard Ave (Keene) Project Manager: Bryce Miller
Week of June 23, 2024:
Week of June 16, 2024:
Week of June 9, 2024:
Week of June 2, 2024:
Week of May 27, 2024:
Week of May 20, 2024:
Week of May 13, 2024:
Week of May 5, 2024:
Week of April 28, 2024:
Week of April 21, 2024:
Week of April 15, 2024:
Week of April 8, 2024:
Week of April 1, 2024:
Week of March 25, 2024 (weather permitting):
- Washington Virginia Vale: ADA ramp, curb and gutter, alley pan and sidewalk repair from E. Leetsdale Drive to E. Mississippi Avenue and S. Glencoe Street to S. Monaco Parkway (Keene) Project Manager: Derek Miles
Week of March 18, 2024 (weather permitting):
- Washington Virginia Vale: ADA ramp, curb and gutter, alley pan and sidewalk repair from E. Leetsdale Drive to E. Mississippi Avenue and S. Glencoe Street to S. Monaco Parkway (Keene) Project Manager: Derek Miles
Week of March 11, 2024 (weather permitting):
- Washington Virginia Vale: ADA ramp, curb and gutter, alley pan and sidewalk repair from E. Leetsdale Drive to E. Mississippi Avenue and S. Glencoe Street to S. Monaco Parkway (Keene) Project Manager: Derek Miles
Week of March 4, 2024 (weather permitting):
- Washington Virginia Vale: ADA ramp, curb and gutter, alley pan and sidewalk repair from E. Leetsdale Drive to E. Mississippi Avenue and S. Glencoe Street to S. Monaco Parkway (Keene) Project Manager: Derek Miles
Week of February 26, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Washington Virginia Vale: ADA ramp, curb and gutter, alley pan and sidewalk repair from E. Leetsdale Drive to E. Mississippi Avenue and S. Glencoe Street to S. Monaco Parkway (Keene) Project Manager: Derek Miles
Week of February 19, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
Week of February 12, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
Week of February 5, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Wash Park West: ADA ramp, curb and gutter, and sidewalk repair on E. Ohio Avenue between S. Downing and S. Pearl Streets (Silva) Project Manager: Derek Miles
Week of January 29, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Wash Park West: ADA ramp, curb and gutter, and sidewalk repair on E. Ohio Avenue between S. Downing and S. Pearl Streets (Silva) Project Manager: Derek Miles
Week of January 22, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Wash Park West: ADA ramp, curb and gutter, and sidewalk repair on E. Ohio Avenue between S. Downing and S. Pearl Streets (Silva) Project Manager: Derek Miles
Week of January 15, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Wash Park West: ADA ramp, curb and gutter, and sidewalk repair on E. Ohio Avenue between S. Downing and S. Pearl Streets (Silva) Project Manager: Derek Miles
Week of January 8, 2024 (weather permitting):
- Montbello: ADA ramp, curb and gutter, and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Wash Park West: ADA ramp, curb and gutter, and sidewalk repair on E. Ohio Avenue between S. Downing and S. Pearl Streets (Silva) Project Manager: Derek Miles
Week of January 1, 2024 (weather permitting):
2023 Weekly Schedule History
Week of December 25, 2023 (weather permitting):
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
Week of December 18, 2023 (weather permitting):
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
Week of December 11, 2023 (weather permitting):
- City Park: ADA ramp, curb and gutter and sidewalk repair between Colorado Boulevard and Dahlia Street and Montview Boulevard and E 26th Avenue (Silva) Project Manager: Finch Pluto
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Washington Park West: ADA ramp, curb and gutter and sidewalk repair between E. Exposition and E. Louisiana Avenues and S. Emerson and S. Corona Streets (Silva) Project Manager: Derek Miles
Week of December 4, 2023 (weather permitting):
- City Park: ADA ramp, curb and gutter and sidewalk repair between Colorado Boulevard and Dahlia Street and Montview Boulevard and E 26th Avenue (Silva) Project Manager: Finch Pluto
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Washington Park West: ADA ramp, curb and gutter and sidewalk repair between E. Exposition and E. Louisiana Avenues and S. Emerson and S. Corona Streets (Silva) Project Manager: Derek Miles
Week of November 27, 2023 (weather permitting):
- Congress Park: ADA ramp, curb and gutter repair at the intersection of E. 12th Avenue and Josephine Street (Silva) Project Manager: Finch Pluto
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, and curb and gutter repair between E. 8th Avenue and E. 14th Avenue and Quebec Street and Monaco Street Parkway (Silva) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter and sidewalk repair between S. Colorado Boulevard and S. Ivanhoe Way and E. Yale and E. Hampden Avenues (Silva) Project Manager: Finch Pluto
- Washington Park West: ADA ramp, curb and gutter and sidewalk repair between E. Exposition and E. Louisiana Avenues and S. Emerson and S. Corona Streets (Silva) Project Manager: Derek Miles
Week of November 20, 2023 (weather permitting):
- Congress Park: ADA ramp, curb and gutter repair at the intersection of E. 12th Avenue and Josephine Street (Silva) Project Manager: Finch Pluto
- Montbello: ADA ramp, curb and gutter and sidewalk repair on E. Andrews Drive between N. Quari Street and N. Chambers Road (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, and curb and gutter repair between E. 8th Avenue and E. 14th Avenue and Quebec Street and Monaco Street Parkway (Silva) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter and sidewalk repair between S. Colorado Boulevard and S. Ivanhoe Way and E. Yale and E. Hampden Avenues (Silva) Project Manager: Finch Pluto
- Washington Park West: ADA ramp, curb and gutter and sidewalk repair between E. Exposition and E. Louisiana Avenues and S. Emerson and S. Corona Streets (Silva) Project Manager: Derek Miles
Week of November 13, 2023 (weather permitting):
- Congress Park: Concrete spot repairs at E. 14th Avenue and Harrison Street and E. 12th Avenue and Josephine Street (Silva) Project Manager: Finch Pluto
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, and curb and gutter repair on E. 14th Avenue between Quebec Street and Monaco Street Parkway (Silva) Project Manager: Derek Miles
Week of November 6, 2023 (weather permitting):
- Congress Park: Concrete spot repairs at E. 14th Avenue and Harrison Street and E. 12th Avenue and Josephine Street (Silva) Project Manager: Finch Pluto
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, and curb and gutter repair on E. 14th Avenue between Quebec Street and Monaco Street Parkway (Silva) Project Manager: Derek Miles
Week of October 30, 2023 (weather permitting):
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- East Colfax: ADA ramp, and curb and gutter repair between Utica and Yosemite Streets and E. Colfax Avenue and Montview Boulevard (Silva) Project Manager: Derek Miles
Week of October 23, 2023 (weather permitting):
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, curb and gutter and sidewalk repair between E. 8th and E. Colfax Avenues and Monaco Street Parkway and Quebec Street (Silva) Project Manager: Derek Miles
Week of October 16, 2023 (weather permitting):
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between S. Steele Street and Colorado Boulevard and E. 2nd and E. Alameda Avenues (Keene) Project Manager: Derek Miles
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between E. 5th and E. 6th Avenues and University Boulevard to Clayton Street (Silva) Project Manager: Finch Pluto
- Cherry Creek: Panel and curb installation at 2500, 2603, and 2700 E. Cherry Creek Drive South (Silva) Project Manager: Finch Pluto
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- Montclair: ADA ramp, curb and gutter and sidewalk repair between E. 10th and E. 14th Avenues and Monaco Street Parkway and Quebec Street (Silva) Project Manager: Derek Miles
- Regis: ADA ramp, curb and gutter, and sidewalk repair between W. 52nd and W. 48th Avenues and Tennyson Street and Lowell Boulevard (Silva) Project Manager: Derek Miles
Week of October 9, 2023 (weather permitting):
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between S. Steele Street and Colorado Boulevard and E. 2nd and E. Alameda Avenues (Keene) Project Manager: Derek Miles
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between E. 5th and E. 6th Avenues and University Boulevard to Clayton Street (Silva) Project Manager: Finch Pluto
- Cherry Creek: Panel and curb installation at 2500, 2603, and 2700 E. Cherry Creek Drive South (Silva) Project Manager: Finch Pluto
- Regis: ADA ramp, curb and gutter, and sidewalk repair between W. 52nd and W. 48th Avenues and Tennyson Street and Lowell Boulevard (Silva) Project Manager: Derek Miles
Week of October 2, 2023 (weather permitting):
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between S. Steele Street and Colorado Boulevard and E. 2nd and E. Cedar Avenues (Keene) Project Manager: Derek Miles
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
- LoHi: Install concrete panels on Navajo, Osage, and Central Streets at W. 20th and W. 32nd Streets (Keene) Project Manager: Derek Miles
Week of September 25, 2023 (weather permitting):
- Cherry Creek: ADA ramp, curb and gutter, and sidewalk repair between S. Steele Street and Colorado Boulevard and E. 2nd and E. Cedar Avenues (Keene) Project Manager: Derek Miles
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
Week of September 18, 2023 (weather permitting):
- Denver Tech Center: Install concrete panels at the intersection of E. Tufts Avenue and S. DTC Boulevard and on adjacent turn lanes (Keene) Project Manager: Derek Miles
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
- University Park/Cory-Merrill: Replace concrete panels at various alleys between E. Evans Avenue and E. Colorado Avenues and S. University Boulevard and I-25 (Keene) Project Manager: Derek Miles
Week of September 11, 2023 (weather permitting):
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
- University Park: Curb and gutter repair on E. Evans Avenue between S. University Blvd and S. St. Paul Street (Keene) Project Manager: Derek Miles
Week of September 5, 2023 (weather permitting):
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
- University Park: Curb and gutter repair on E. Evans Avenue between S. Clayton and S. Steele Streets (Keene) Project Manager: Derek Miles
Week of August 28, 2023 (weather permitting):
- Green Valley Ranch: ADA ramp, curb and gutter, and sidewalk repair between N. Tower and N. Picadilly Roads and E. 38th and E. 56th Avenues (Silva) Project Manager: Finch Pluto
- University Park: Curb and gutter repair on Evans Avenue between University Blvd and St. Paul St (Keene) Project Manager: Derek Miles
Week of August 21, 2023 (weather permitting):
- Hampden: cross-pan at S. Xeric Ct and E. Doane Place (Silva) Project Manager: Finch Pluto
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between S. Albion and S. Dahlia Streets and E. Eastman and E. Girard Avenues (Silva) Project Manager: Finch Pluto
- University Park: Repair of two alleyways between Josephine and Columbine from Asbury to Evans; alley repair between University and York from Harvard to Vassar; curb and gutter repair on Evans Ave between University Blvd and St. Paul St; cross-pan and alley repair at S. Clayton St. and E. Colorado Avenue (Keene) Project Manager: Derek Miles
- Wellshire: ADA ramp, curb and gutter, and sidewalk repair on Steele Street from Dartmouth to Yale (Silva) Project Manager: Derek Miles
Week of August 14, 2023 (weather permitting):
- Hampden: cross-pan at S. Xeric Ct and E. Doane Place (Silva) Project Manager: Finch Pluto
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between S. Albion and S. Dahlia Streets and E. Eastman and E. Girard Avenues (Silva) Project Manager: Finch Pluto
Week of August 7, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles, and between S. Albion and S. Dahlia Streets and E. Eastman and E. Girard Avenues (Silva) Project Manager: Finch Pluto
Week of July 31, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles
Week of July 24, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of July 17, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- University Hills: ADA ramp, curb and gutter, and sidewalk repair between E. Hampden and E. Eastman Avenues and S. Dahlia Street to I-25 (Silva) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of July 9, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of July 3, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of June 26, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of June 19, 2023 (weather permitting):
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th Avenue and Montview Boulevard and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of June 12, 2023 (weather permitting):
- Athmar Park: ADA ramp, curb and gutter, and sidewalk repair between W. Exposition and W. Mississippi Avenues and S. Zuni and S. Pecos Streets; and on the south side of W. Alameda Avenue from S. Zuni Street to S. Raritan Street (Silva) Project Manager: Derek Miles
- North Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th and Montview Avenues and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk repair between Sheridan and Federal Boulevards and W. Colfax and W. 10th Avenues (Silva) Project Manager: Derek Miles
Week of June 5, 2023 (weather permitting):
- Athmar Park: ADA ramp, curb and gutter, and sidewalk repair between W. Exposition and W. Mississippi Avenues and S. Zuni and S. Pecos Streets (Silva) Project Manager: Derek Miles
- Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th and Montview Avenues and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
Week of May 30, 2023 (weather permitting):
- Athmar Park: ADA ramp, curb and gutter, and sidewalk repair between W. Exposition and W. Mississippi Avenues and S. Zuni and S. Pecos Streets (Silva) Project Manager: Derek Miles
- Park Hill: ADA ramp, curb and gutter, and sidewalk repair between E. 26th and Montview Avenues and N. Monaco Street Parkway and N. Quebec Street (Keene) Project Manager: Derek Miles
Week of May 8, 2023 (weather permitting):
- Sloan's Lake: ADA ramp, curb and gutter, and sidewalk between W. 26th and W. 32nd Avenues and Tennyson Street and Sheridan Boulevard (Silva) Project Manager: Derek Miles
- Villa Park: ADA ramp, curb and gutter, and sidewalk between W. Colfax and W. 10th Avenues and Sheridan and Lowell Boulevards (Silva) Project Manager: Derek Miles
Week of May 1, 2023 (weather permitting):
- Chaffee Park: ADA ramp, curb and gutter, and sidewalk between W. 50th and W. 52nd Avenues and Vallejo Street and Federal Boulevard (Silva) Project Manager: Derek Miles
Week of April 24, 2023 (weather permitting):
- Chaffee Park: ADA ramp, curb and gutter, and sidewalk between W. 48th and W. 52nd Avenues and Tejon Street and Federal Boulevard (Silva) Project Manager: Derek Miles
Week of April 17, 2023 (weather permitting):
-
Sunnyside: ADA ramp, curb and gutter, and sidewalk between:
- W. 44th Avenue and W. 48th South Drive and Lipan and Zuni Streets; and
- W. 38th and W. 44th Avenues and Kalamath and Pecos Streets
(Silva) Project Manager Derek Miles
- Washington Virginia Vale: ADA ramp, curb and gutter, and sidewalk between E. Louisiana and E. Florida Avenues and S. Monaco Avenue Parkway and S. Quebec Street (Keene) Project Manager: Derek Miles
Week of April 10, 2023 (weather permitting):
-
Sunnyside: ADA ramp, curb and gutter, and sidewalk between:
- W. 44th Avenue and W. 48th South Drive and Lipan and Zuni Streets;
- W. 38th and W. 44th Avenues and Kalamath and Pecos Streets; and
- W. 33rd and W. 38th Avenues and Pecos Street and I-25
(Silva) Project Manager Derek Miles
- Washington Virginia Vale: ADA ramp, curb and gutter, and sidewalk between E. Louisiana and E. Florida Avenues and S. Monaco Avenue Parkway and S. Quebec Street (Keene) Project Manager: Derek Miles
Week of April 3, 2023 (weather permitting):
-
Sunnyside: ADA ramp, curb and gutter, and sidewalk between:
- W. 44th Avenue and W. 48th South Drive and Lipan and Zuni Streets;
- W. 38th and W. 44th Avenues and Kalamath and Pecos Streets; and
- W. 33rd and W. 38th Avenues and Pecos Street and I-25
(Silva) Project Manager Derek Miles
Week of March 28, 2023 (weather permitting):
- Central Business District/Ballpark: ADA ramp, curb and gutter and sidewalk between E. 19th and E. 22nd Avenues and Market and Wazee Streets (Keene) Project Manager: Amy Strouthopoulos
- South Park Hill: ADA ramp and curb and gutter on south side of E. 17th Avenue between Colorado Boulevard and Monaco Avenue Parkway (Silva) Project Manager: Derek Miles
- University Hills: ADA ramps and sidewalk repair on S. Fairfax Street between E. Dartmouth and E. Cornell Avenues (Keene) Project Manager: Derek Miles
- Ruby Hill: ADA ramp, curb and gutter, and sidewalk between Federal Boulevard and S. Zuni Street and W. Mississippi and W. Florida Avenues (Silva) Project Manager: Derek Miles
- Sunnyside: ADA ramp, curb and gutter, and sidewalk between:
- W. 44th Avenue and W. 48th South Drive and Lipan and Zuni Streets;
- W. 38th and W. 44th Avenues and Kalamath and Pecos Streets; and
- W. 33rd and W. 38th Avenues and Pecos Street and I-25
(Silva) Project Manager Derek Miles
Week of March 20, 2023 (weather permitting):
- Central Business District/Ballpark: ADA ramp, curb and gutter and sidewalk between E. 19th and E. 22nd Avenues and Market and Wazee Streets (Keene) Project Manager: Amy Strouthopoulos
- City Park/City Park West/Whittier/Skyland/Cole/Clayton: ADA ramp and curb and gutter on both sides of York Street between E. 22nd and E. 37th Avenues (Silva) Project Manager: Derek Miles
- South Park Hill: ADA ramp and curb and gutter on south side of E. 17th Avenue between Colorado Boulevard and Monaco Avenue Parkway (Silva) Project Manager: Derek Miles
- University Hills: ADA ramps and sidewalk repair on S. Fairfax Street between E. Dartmouth and E. Cornell Avenues (Keene) Project Manager: Derek Miles
Week of March 13, 2023 (weather permitting):
Week of March 6, 2023 (weather permitting):
- North Capitol Hill: ADA ramp, sidewalk and gutter repair, and alley pan replacement between Washington Street to Emerson Street and E. 17th and E. 18th Avenues (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramp, curb and gutter, and sidewalk repair between E. 33rd and E. 37th Avenues and Franklin and Humboldt Streets (Keene) Project Manager: Derek Miles
Week of February 27, 2023 (weather permitting):
- Elyria-Swansea: ADA ramps, gutter overlay, and sidewalk repair on York and Josephine Streets between E. 42nd and E. 48th Avenues (Silva) Project Manager: Derek Miles
- North Capitol Hill: ADA ramp, sidewalk and gutter repair, and alley pan replacement between Washington Street to Emerson Street and E. 17th and E. 18th Avenues (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of February 21, 2023 (weather permitting):
- Elyria-Swansea: ADA ramps, gutter overlay, and sidewalk repair on York and Josephine Streets between E. 42nd and E. 48th Avenues (Silva) Project Manager: Derek Miles
- Montbello: Islands will be installed on Dillon Street east and west of the intersection with Bolling Drive, and on Bolling Drive north of the intersection with Dillon Street (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of February 13, 2023 (weather permitting):
- Bear Valley: ADA ramps between W. Yale and W. Dartmouth Avenues, and S. Webster and S. Lamar Streets (Silva) Project Manager: Derek Miles
- Elyria-Swansea: ADA ramps, gutter overlay, and sidewalk repair on York and Josephine Streets between E. 42nd and E. 48th Avenues (Silva) Project Manager: Derek Miles
- Montbello: Islands will be installed on Dillon Street east and west of the intersection with Bolling Drive, and on Bolling Drive north of the intersection with Dillon Street (Keene) Project Manager: Amy Strouthopoulos
Week of February 6, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
- Montbello: Islands will be installed on Dillon Street east and west of the intersection with Bolling Drive, and on Bolling Drive north of the intersection with Dillon Street (Keene) Project Manager: Amy Strouthopoulos
Week of January 30, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
Week of January 24, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
Week of January 17, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
Week of January 10, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
Week of January 2, 2023 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
2022 Weekly Schedule History
Week of December 27, 2022 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
Week of December 19, 2022 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
Week of December 12, 2022 (weather permitting):
- Harvey Park: ADA ramps and sidewalk repair between W. Jewell and W. Iliff Avenues and S. Tennyson and S. Hazel Court (Silva) Project Manager: Derek Miles
- Marston: ADA ramps and sidewalk repair between W. Prentice Avenue and W. Dorado Drive and S. Ingalls Street and Grant Ranch Boulevard (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of December 5, 2022 (weather permitting):
- Goldsmith: ADA ramps at the intersections of E. Evans Avenue and S. Holly Street and E. Evans Avenue and S. Dahlia Street (Silva) Project Manager: Norman Shaw
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of November 21, 2022 (weather permitting):
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of November 14, 2022 (weather permitting):
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of November 7, 2022 (weather permitting):
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
Week of October 31, 2022 (weather permitting):
- Baker/Speer: Panel replacements on Lincoln Street between E. 2nd and E. 4th Avenues (Keene) Project Manager: Derek Miles
- Marston: Concrete Spot Repairs on W. Prentice Circle and W. Prentice Court (Keene) Project Manager: Amy Strouthopoulos
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of October 24, 2022 (weather permitting):
- Baker/Speer: Panel replacements on Lincoln Street between E. 2nd and E. 4th Avenues (Keene) Project Manager: Derek Miles
- Sloan’s Lake: ADA ramps, curb, and gutter between Federal and Lowell Boulevards and W. 16th and W. 23rd Avenues; sidewalk repair between Federal and Lowell and 21st and 23rd Avenues (Silva) Project Manager: Derek Miles/Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of October 17, 2022 (weather permitting):
- Athmar Park: ADA ramps, curb and gutter between W. Alameda and W. Exposition Avenues and S. Pecos and S. Zuni Streets (Silva) Project Manager: Derek Miles
- Baker/Speer: Panel replacements on Lincoln Street between E. 2nd and E. 4th Avenues (Keene) Project Manager: Derek Miles
- Marston: Concrete Spot Repairs between W. Crestline Avenue and W. Dorado Drive and S. Otis Court and S. Ingalls Street (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of October 9, 2022 (weather permitting):
- Athmar Park: ADA ramps, curb and gutter between W. Alameda and W. Exposition Avenues and S. Pecos and S. Zuni Streets (Silva) Project Manager: Derek Miles
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of October 2, 2022 (weather permitting):
- Athmar Park: ADA ramps, curb and gutter between W. Alameda and W. Exposition Avenues and S. Pecos and S. Zuni Streets (Silva) Project Manager: Derek Miles
- Cherry Creek North: Concrete spot repairs in alleys from E. 5th Avenue to E. 6th Avenue between Garfield and Monroe Streets and Monroe and Madison Streets (Keene) Project Manager: Amy Strouthopoulos
- University Hills: ADA ramps and sidewalk repair between E. Yale Avenue and Highline Place and S. Dahlia Street and S. Grape Way (Keene) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of September 26, 2022 (weather permitting):
- Lowry: ADA ramp, curb and gutter repair on E. Ellsworth Avenue between Roslyn and Quince Streets; installation of new crosspan across E. Ellsworth Avenue at Quince Street (Keene) Project Manager: Amy Strouthopoulos
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of September 19, 2022 (weather permitting):
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of September 12, 2022 (weather permitting):
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of September 5, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of August 29, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
Week of August 22, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of August 15, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of August 8, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of August 1, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street. Sidewalk repair occurring within the boundaries of E 26th to E 35th Avenue and Downing to York Streets (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of July 25, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of July 18, 2022 (weather permitting):
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street (Keene) Project Manager: Derek Miles
- Congress Park/Cheesman Park: ADA ramps , curb and gutter and spot repair between E. Colfax and E. 12th Avenues and Race Street and University Boulevard (Keene); and at E. 9th Avenue and York Street (Keene) Project Manager: Amy Strouthopoulos.
Week of July 11, 2022 (weather permitting):
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Birch Street (Chatos) Project Manager: Derek Miles
- Whittier: ADA ramps, curb and gutter between Downing and York Streets and E. 26th Avenue and Martin Luther King Boulevard; curb repair at E. 36th Avenue and High Street and E. 34th Avenue and Marion Street (Keene) Project Manager: Derek Miles
- Sloans Lake/West Colfax: ADA Ramps on 17th Avenue between Sheridan and Federal Boulevards (Silva) Project Manager: Norman Shaw
Week of July 5, 2022 (weather permitting):
Week of June 27, 2022 (weather permitting):
Week of June 20, 2022 (weather permitting):
Week of June 13, 2022 (weather permitting):
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Cherry Streets (Chatos) Project Manager: Derek Miles
Week of June 6, 2022 (weather permitting):
- Montbello: ADA ramps, curb and gutter between E. 46th and E. 55th Avenues and N. Peoria and N. Chambers Streets (Silva) Project Manager: Norman Shaw
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Cherry Streets (Chatos) Project Manager: Derek Miles
Week of May 30, 2022 (weather permitting):
- Central Business District: ADA ramps, curb and gutter at 15th and Arapahoe Streets (Keene) Project Manager: Derek Miles
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Cherry Streets (Chatos) Project Manager: Derek Miles
Week of May 23, 2022 (weather permitting):
- Central Business District: ADA ramps, curb and gutter at 15th and Arapahoe Streets (Keene) Project Manager: Derek Miles
- University Park/University Hills North: ADA ramps, curb and gutter on the north and south sides of E. Evans Avenue between S. Monroe and S. Cherry Streets (Chatos) Project Manager: Derek Miles
Week of May 16, 2022 (weather permitting):
Week of May 9, 2022 (weather permitting):
Week of May 2, 2022 (weather permitting):
Week of April 25, 2022 (weather permitting):
Week of April 18, 2022 (weather permitting):
Week of April 11, 2022 (weather permitting):
Week of April 4, 2022 (weather permitting):
- Athmar Park: ADA curb ramps, sidewalk, curb and gutter between S. Federal Boulevard and S. Pecos Street, and W. Alameda and W. Exposition Avenues (Silva) Project Manager: Derek Miles
- University Park: ADA curb ramps between S. University Boulevard and S. St. Paul Street, and Buchtel Boulevard to E. Vassar Avenue
Week of March 28, 2022 (weather permitting):
Week of March 21, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
Week of March 14, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of March 7, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of February 28, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of February 21, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of February 14, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of February 7, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of January 31, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of January 24, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of January 18, 2022 (weather permitting):
- University: ADA curb ramps from S. Marion Street to S. York Street between E. Iliff Avenue and E. Yale Avenue (Silva) Project Manager: Derek Miles
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles
Week of January 10, 2022 (weather permitting):
- Washington Park West/Washington Park: ADA curb ramps from S. Grant Street to S. Franklin Street between E. Dakota and E. Exposition Avenues (Silva) Project Manager: Derek Miles
- West Highland: ADA curb ramps from Lowell Boulevard to Federal Boulevard between W. 32nd and W 38th Avenues (Keene) Project Manager: Derek Miles